Skip to Page Content Image: Official Website for the First State
Visit the Governor |  General Assembly |  Courts |  Elected Officials |  State Agencies
State Phone Directory |  Help |  Search
Citizen Services |  Business Services |  Tourism Info.
Go Mobile!      Email A Friend
Doing Business with DelDOT
Design Resource Center

All Guidelines
File Name Section
Advanced Utility Relocation Authorization Process Adobe PDF file Utilities
Approved Product List for Soil Retention Blanket Mulch Adobe PDF file Stormwater Management & Erosion and Sediment Control
Approved Testing for Infiltration Practices Adobe PDF file Stormwater Management & Erosion and Sediment Control
Bentley ETS Training Courses Microsoft Excel format CADD
Change Order Reason Codes Adobe PDF file Project Management
Current Flagger Rates Adobe PDF file Scheduling & Estimating
DelDOT Bridge Atlas Bridge Design
DGM No. 1-1: Brick and Sidewalk Payment Methods Adobe PDF file Scheduling & Estimating
DGM No. 1-2: Class C Pipe Bedding Payment Methods Adobe PDF file Scheduling & Estimating
DGM No. 1-3: Use of Guardrail End Sections Adobe PDF file Highway Design
DGM No. 1-6: Use of Concrete Pavement Rubblization Adobe PDF file Pavement & Materials
DGM No. 1-7: Contractor Certification Requirements Adobe PDF file Project Management
DGM No. 1-8: Use of Grass Shoulders Adobe PDF file Highway Design
DGM No. 1-9: Procedures for Requesting Pavement Cores and/or Soil Borings Adobe PDF file Pavement & Materials
DGM No. 1-10: Pavement Design Requirements Adobe PDF file Pavement & Materials
DGM No. 1-11: Procedures for Requesting Subsurface Information for Consultant Design Projects Adobe PDF file Pavement & Materials
DGM No. 1-12: Escrow of Bid Documents Adobe PDF file Project Management
DGM No. 1-14: Bus Shelter Setback Requirements Adobe PDF file Highway Design
DGM No. 1-15: Use of Personnel Safety Grates on Pipe Inlets Adobe PDF file Hydrology & Hydraulics
DGM No. 1-16: Curb Ramps - Locations and Design Requirements Adobe PDF file Highway Design
DGM No. 1-17: Corrugated Polyethylene Pipe - Superseded by DGM 1-20 Hydrology & Hydraulics
DGM No. 1-18: Continuous Centerline and Longitudinal Edgeline Rumble Strips Adobe PDF file Highway Design
DGM No. 1-19: GPS Machine Control Adobe PDF file Bridge Design, Construction, Highway Design
DGM No. 1-20: Pipe Materials - REVISED Hydrology & Hydraulics
DGM No. 2-1: Minimum Size of Strip Seal Joints on Bridges Adobe PDF file Bridge Design
DGM No. 2-2: Cantilever Sign and Trafffic Signal Anchoring Requirements Adobe PDF file Bridge Design
DGM No. 2-3: Roadside Treatments Under Structures Adobe PDF file Bridge Design
DGM No. 2-4: Approach Slab Requirements Adobe PDF file Bridge Design
DGM No. 2-5: Bridge Scupper Design Recommendations Adobe PDF file Bridge Design
DGM No. 2-6: Shop Drawing Stamping Process Adobe PDF file Bridge Design
Draft CPM and Timing Specification Adobe PDF file Scheduling & Estimating
DTC Bus Dimensions Adobe PDF file Highway Design
FHWA Authorization to Advertise Checklist Adobe PDF file Project Management
Guardrail Installer Training Guide (For Guidance Only) Adobe PDF file Bridge Design, Construction, Highway Design
Historic Bid Tab Search Scheduling & Estimating
Hot-Mix Yield Chart Adobe PDF file Pavement & Materials, Scheduling & Estimating
Markings - Centerline Striping Guidelines Adobe PDF file Traffic
Markings - Recessed Pavement Marker (RPM) Guidelines Adobe PDF file Traffic
Markings - Striping Items Guidelines Adobe PDF file Traffic
MathCAD Solutions to the Regression Equation Bridge Design
Notes - Maintenance of Traffic Adobe PDF file Project Management
Notes - Project Adobe PDF file Project Management
Plan Development Process Adobe PDF file Project Management
Plan Revision Guidelines Adobe PDF file Project Management
Plan Sheet Sequence Adobe PDF file Project Management
Plan Submission Checklist Adobe PDF file Project Management
PS&E to Completion Date Contract Time Calculator Microsoft Excel file format Scheduling & Estimating
Regression Equation Application Procedures Adobe PDF file Bridge Design
Right-of-Way Plan Checklist Adobe PDF file Project Management, Right-of-Way
Signalization - Traffic Loop Placement Adobe PDF File Format Traffic
Signing - Multi Lane Roundabout Adobe PDF File Format Traffic
Signing - Single Lane Roundabout Adobe PDF File Format Traffic
Special Provision Creation Guidelines Microsoft Word file format Highway Design
Standard Items and Special Provisions List Adobe PDF file Microsoft Excel file format Scheduling & Estimating
Summary of Production Rates Scheduling & Estimating
USGS StreamStats for Delaware Bridge Design
Utility Company Abbreviations Adobe PDF file Utilities
Usage of Carbonate and Non-Carbonate Stone Hot-Mix Items Pavement & Materials
Utility Coordination Guidelines Adobe PDF file Utilities
Information
 
Public Feedback
Contact:  Public Relations
Phone:  302-760-2080
1-800-652-5600(in-state only)
email: dotpr@state.de.us


DRC Contact Information:
(North Region)

Mike Balbierer
Department of Transportation
P.O. Box 778
Dover, DE 19903
Phone: (302) 760-2343
Michael.Balbierer@state.de.us
 
Last Updated: Friday, 26-Sep-2008 07:56:11 Eastern Daylight Time
site map   |   about this site   |    contact us   |    translate   |    delaware.gov

Link to the State of Delaware Web PortalLink to the State of Delaware Web PortalLink to Delaware Facts and Symbols