INFORMATION

Project Limits:

From Old Baltimore Pike to Eagle Run Road/Chapman Road

Project Need:

As part of the SR 273 Pedestrian Safety Audit conducted in September 2011, sidewalk along one side of SR 273 from Old Baltimore Pike to Eagle Run Road/Chapman Road was recommended to be installed in order to provide an improved pedestrian network between adjacent land uses.

Project Overview:

This project will add sidewalk to the north side of SR 273 from Old Baltimore Pike to Eagle Run Road. The project includes construction of the sidewalk infrastructure, modification to existing curb ramps to make them ADA compliant, associated curb ramp and some minor guardrail improvements. All of the work is occurring within existing right-of-way.

Project Timeline:

Design Phase:

Design work in 2017

Construction Phase:

Construction begin Summer/Fall of 2017.