Project Limits:

The project limits extended approximately 800 feet north and south of the intersection of US 13 and Dorothy/Whitesville Road.

Project Need:

This project was identified in the 2012 High Risk Rural Roads Program. It was identified as a safety problem due to the number of crashes at the intersection.

Project Overview

This project installed channelization in the median to allow left turns only from northbound and southbound US 13 which reduces the potential for angle crashes at this location and improve the safety of the intersection.

Project Schedule:

Anticipated/Actual Start Date

February 29, 2016

Actual Substantial Completion Date

May 19, 2016



(Reviewed and Updated 1/25/2017)