INFORMATION

Project Limits:

Proposed transportation improvements extend along SR299 in Middletown from Catherine Street east through the SR1 interchange.

Project Need:

The SR299 corridor currently experiences congestion during the morning and afternoon peak hours and lacks bicycle and pedestrian facilities. This project will address the congestion, safety and pedestrian/bicycle infrastructure improvements.

Proposed Improvements:

Proposed improvements include:

  • Reconstructing SR299 from Catherine Street to SR1
  • Catherine St to Cleaver Farm Road - Two 11-ft travel lanes with 12-ft center lane for left turn opportunities.
  • Cleaver Farm Road to SR1 - Four 11-ft travel lanes section with center raised median
  • A combination of 5-ft Sidewalk or 10-ft multi-use paths will be constructed through the entire length of project.

Current Project Schedule:

Public workshop was held on December 2, 2015
Design to be completed in 2018
Real Estate acquisition anticipated to start late 2017 through 2018

Project Schedule

This project is currently in the design phase.
Anticipated Right-of-Way Acquisition – Begin Fall 2017
Anticipated Start of Construction – TBD.
This will be coordinated with the project at Cedar Lane and Marl Pit Road Intersection.
Anticipated End of Construction – TBD


(Reviewed and Updated on 02/24/2017)