Project Limits:
This project encompassed three intersections on US 9 between Georgetown and Lewes: US 9/SR 30 (Gravel Hill Road), US 9/Hudson Road/Fisher Road, and US 9/Sweetbriar Road/Dairy Farm Road.
Project Need:
These three intersections have been designated Highway Safety Improvement Program sites. This project added separate left-turn, through and right-turn lanes on the approach legs at each intersection to improve driver safety and reduce accident rates. Some minor improvements to road geometry also was constructed.
Construction Schedule:
Construction start: March 2014
Construction completed November 2015
(Reviewed and Updated on 3/2/2016)