OSOW Temporary Restrictions

Restricted Route Name Restricted Route Description
AIRPORT RD (CR407) Vicinity: MILFORD

AIRPORT RD will close at the intersection with CANTERBURY RD on 10/27/2025 for the reconstruction of the intersection.

Projected Completion Date: 11/24/2025
BAYARD RD (CR384) Vicinity: FRANKFORD

BAYARD RD will close on 10/20/2025 located between SR20 (ZION CHURCH RD) and OLD MILL BRIDGE RD.

Projected Completion Date: 11/20/2025
CANAL ST Vicinity: REHOBOTH

CANAL ST will close on 10/27/2025 located between SR1A REHOBOTH AVE and 6TH ST.

Projected Completion Date: 01/19/2026
CHRISTINA AVE (CR28A) Vicinity: WILMINGTON

CHRISTINA AVE will close for one day at the Railroad Crossings on 11/10/2025 located between TERMINAL AVE and A ST.
GODWIN SCHOOL RD (CR410) Vicinity: MILLSBORO

GODWIN SCHOOL RD will close on 11/03/2025 for roadway improvements located between SR24 and REVEL RD.

Projected Completion Date: 11/09/2025
I295 SB Vicinity: WILMINGTON

I295 Southbound under Bridge 1739 059 will be restricted to a maximum load height of 14 feet, 9 inches due to the placement of shielding beginning 3/31/2025.

This will affect loads moving to I95 Northbound, I95 Southbound and SR141 Northbound.

Projected Completion Date: 3/31/2026
I495 SB RAMP TO I295 NB Vicinity: WILMINGTON

I495 Southbound ramp to I295 Northbound is restricted to a maximum load width of 13 feet due to ramp improvements.

Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route.

Projected Completion Date: 6/30/2026
I495 SOUTHBOUND (BRIDGE 1 800 060) BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED.

FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTREME RIGHT HAND LANE.

FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND.

Proposed Completion Date: 12/31/2026
I95 NB RAMP TO SR896 Vicinity: NEWARK
I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration.
Proposed Completion Date: 12/31/2025

Vicinity: NEWARK
I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration.
Proposed Completion Date: 12/31/2025
I95 SB Vicinity: NEWARK

I95 Southbound at the SR273 Interchange, Bridges 1715B 6047, 1715A 6048, and 1715 018, will be restricted to a maximum load height of 14 feet, 10 inches due to the placement of shielding beginning 09/15/2025.

Projected Completion Date: 11/07/2025
I95 SB Vicinity: NEWARK

I95 Southbound under the SALEM CHURCH RD flyover, Bridge 1711 348, will be restricted to a maximum load height of 15 feet, 2 inches due to the placement of shielding beginning 10/17/2025.

Projected Completion Date: 11/26/2025
I95 SB RAMP TO I295 NB (EXIT 5C) Vicinity: WILMINGTON

I95 Southbound ramp to I295 Northbound (Exit 5C) is restricted to a maximum load width of 13 feet due to ramp improvements.

Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route. This restriction will be in place until March, 2026.

Projected Completion Date: 4/30/2026
KENTON RD (CR104) Vicinity: DOVER

KENTON RD will close for road improvements beginning 4/8/2025 located between SR8 and COLLEGE RD.

Projected Completion Date: 11/21/2025
NASSAU RD (CR266B) Vicinity: LEWES

NASSAU RD will close for sewer main repair on 9/22/2025 located between NEW RD and QUEEN ANNE WAY.

Projected Completion Date: 11/17/2025
OLD RACETRACK RD (CR502) Vicinity: DELMAR

OLD RACETRACK RD will close at the Railroad Crossing on 11/08/2025 located between N 2ND ST and BRICK MANOR RD.

Projected Completion Date: 11/10/2025
PYLES FORD RD (CR239) Vicinity: WILMINGTON

PYLES FORD RD will close on 10/29/2025 for bridge replacement located between WALNUT GREEN RD and SR82 NEW LONDON RD.

Projected Completion Date: 01/01/2026
S PARK DR Vicinity: WILMINGTON

S PARK DR will close on 11/03/2025 located between N VAN BUREN ST and LOVERING AVE.

Projected Completion Date: 02/02/2026
SR1 (COASTAL HWY) Vicinity: MILTON

SR1, Northbound and Southbound, is restricted to a maximum load width of 18 feet between SR5 and the Broadkill River near Milton due to the placement of pinned barrier.

Projected Completion Date: 10/31/2025
SR1 NB (COASTAL HWY) Vicinity: SUSSEX

SR1 Northbound, between Marsh Rd and Nassau Rd will be restricted to a maximum width of 20 feet beginning 07/28/2025 due to the placement of pinned barrier.

Projected Completion Date: 11/17/2025
SR1 NB RAMP TO I95 NB (EXIT 165B) Vicinity: CHRISTIANA

SR1 Northbound ramp to I95 Northbound (EXIT 165B) will be restricted to a maximum width of 15 feet on 10/27/2025, due to the placement of pinned barrier.

Projected Completion Date: 12/20/2025
SR10 (W LEBANON RD) Vicinity: DOVER

SR10 will close for the construction of a roundabout on 11/10/2025 located between US13 and LORDSHIP LN.

Projected Completion Date: 12/14/2025
SR100 (MONTCHANIN RD) Vicinity: WILMINGTON

MONTCHANIN RD will close for crossroad pipe replacement on 11/17/2025 located between BRENDLE LN and GUYENCOURT RD.

Projected Completion Date: 12/01/2025
SR15 (CANTERBURY RD) Vicinity: MILFORD

CANTERBURY RD will close at the intersection of AIRPORT RD on 10/27/2025 for the reconstruction of the intersection.

Projected Completion Date: 11/24/2025
SR24 John J Williams Highway Vicinity: MILLSBORO

SR24 is restricted to a maximum load width of 10 feet between Hollyville Rd (305) and Maryland Camp Rd (304) due to the placement of temporary barrier.

Projected Completion Date: 11/10/2025
SR273 WB RAMP TO I95 SB Vicinity: NEWARK

SR273 Westbound ramp to I95 Southbound will be restricted to a maximum load height restriction of 14 feet, 5 inches due to the placement of shielding beginning 07/21/2025.

Projected Completion Date: 11/14/2025
SR273 at BR 1-715C Vicinity: NEWARK

SR273, at the SR273 Eastbound flyover ramp to I95 Northbound, will be restricted to a maximum load height restriction of 14 feet, 6 inches due to the placement of shielding beginning 09/19/2025.

Projected Completion Date: 11/14/2025
SR58 EB (CHURCHMANS RD) Vicinity: NEW CASTLE

SR58 Eastbound will close on 10/17/2025 for sewer main placement located between SR37 and SR273.

Projected Completion Date: 11/17/2025
SR896 NB Vicinity: NEWARK

SR896 Northbound, has a maximum width restriction of 11 feet due to the placement of pinned barrier located between I95 and WELSH TRACT RD.

Projected Completion Date: 11/26/2025
SR896 RAMP TO I95 SB Vicinity: NEWARK

SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration.

Detour, please use 896 - 4 - 273 - 95 - ect

Proposed Completion Date: 12/31/2025
SR896 SB Vicinity: NEWARK

SR896 Southbound, has a maximum width restriction of 12 feet, 4 inches, due to the placement of pinned barrier located between I95 and WELSH TRACT RD .

Projected Completion Date: 11/26/2025
SR896 SB RAMP TO I95 NB Vicinity: NEWARK

SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet.

Projected Completion Date: 12/31/2025
SR9 (5th St) Vicinity: DELAWRE CITY

SR9 will close on 10/15/2025 at the bridge over Dragon Creek, located between CLARKS CORNER RD and CLINTON ST

Projected Completion Date: 3/23/2026
SR9 (HAY POINT LANDING RD) Vicinity: SMYRNA

SR9 will close for roadway improvements on 11/10/2025 located between DEAKYNEVILLE RD and SHORTS LANDING RD.

Projected Completion Date: 12/11/2025
SR9 (ST AUGUSTINE RD) Vicinity: MIDDLETOWN

SR9 will close on 11/10/2025 for road improvements located between BELTS RD and SIXTH ST

Proposed Completion Date: 12/10/2025
TULIP DR Vicinity: LEWES

TULIP DR will close on 07/28/2025 for roadway improvements located between SR1 and TULIP DR.

Projected Completion Date: 11/17/2025
US113 NB (DUPONT BLVD) Vicinity: MILFORD

US113 Northbound will be restricted to a maximum load width of 11 feet on 09/21/2025 for the placement of pinned concrete barrier over the Haven Lake Dam.

Projected Completion Date: 11/21/2025
US113 SB (DUPONT BLVD) Vicinity: MILFORD

US113 Southbound will be restricted to a maximum load width of 11 feet on 09/21/2025 for the placement of pinned concrete barrier over the Haven Lake Dam.

Projected Completion Date: 11/21/2025
US13A (S GOVERNORS AVE) Vicinity: DOVER

S GOVERNORS AVE will close for crossroad pipe replacement on 10/23/2025 located between BANK LN and W WATER ST.

Projected Completion Date: 11/20/2025
WHITELEYSBURG RD Vicinity: HARRINGTON

WHITELEYSBURG RD will close on 11/10/2025 located between INGRAM BRANCH RD and BULLOCK RD.

Projected Completion Date: 11/14/2025