Restricted Route Name Restricted Route Description
FORK BRANCH RD (CR153) Vicinity: DOVER

FORK BRANCH RD will close for crossroad pipe replacement on 11/27/2023 between US13 and MCKEE RD.

Projected Completion Date: 12/8/2023
I95 NB RAMP TO SR896 Vicinity: NEWARK
I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration.
Proposed Completion Date: 6/15/2024

Vicinity: NEWARK
I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration.
Proposed Completion Date: 6/15/2024
I95 SB RAMP TO SR896 SB Vicinity: NEWARK

I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder.
Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet.

Projected Completion Date: 5/1/2024
LOREWOOD GROVE RD (CR412) Vicinity: MIDDLETOWN

LOREWOOD GROVE RD will close on 12/9/2023 and 12/10/2023 between HOPE DR and CROSSLANDS BLVD for a new pedestrian crossing.
MILLCREEK RD (CR282) Vicinity: HOCKESSIN

MILLCREEK RD will close on 12/6/2023 and 12/7/2023 for guardrail replacement between BRACKENVILLE RD and MENDENHALL MILL RD.
OLD COOCHS BRIDGE RD (CR408) Vicinity: NEWARK

OLD COOCHS BRIDGE RD intersection with SR896 is closed for reconstruction.

Detour: Access to OLD COOCHS BRIDGE RD should be made from OLD BALTIMORE PIKE.

Proposed Completion Date: 4/30/2024
OLD KENNETT RD (CR243) Vicinity: WILMINGTON

OLD KENNETT RD will close for culvert replacement on 11/27/2023 between ASHLAND SCHOOL RD and WAY RD.

Projected Completion Date: 12/11/2023
PLANTATION RD (CR275) Vicinity: LEWES

PLANTATION RD will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SHADY RD.

Projected Completion Date: 5/15/2024
ROGERS RD (CR369) Vicinity: WILMINGTON

ROGERS RD is closed between MARKET ST and S HEALD ST for reconstruction.

Projected Completion Date: 1/16/2024
S BAY RD Vicinity: DOVER

S BAY RD under SR1 overpass, BRIDGE 2924S 150, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 8/24/2023.

Projected Completion Date: 12/22/2023
SR1 (BAY RD) Vicinity: MILFORD

SR1 under US113 overpass, BRIDGE 2008J 008, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting.
This height restriction will be in place for both Northbound and Southbound lanes and begin on 10/23/2023.
Projected Completion Date: 12/22/2023

SR1 under SR36 will be restricted to loads with a maximum width of 20 feet due to shoulder closures.
Projected Completion Date: 12/22/2023
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) Vicinity: DOVER

SR 1 under the PUNCHEON RUN CONNECTOR overpass, BRIDGE 2926 150A, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting.
This height restriction will be in place for both Northbound and Southbound lanes and begin on 10/19/2023.

Projected Completion Date: 12/10/2023
SR23 (BEAVER DAM RD) Vicinity: LEWES

SR23 will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SALT MARSH BLVD.

Projected Completion Date: 5/15/2024
SR24 (JOHN J WILLIAMS HWY) Vicinity: LEWES

SR24 at MULBERRY KNOLL RD has a maximum height restriction of 15 feet, 5 inches due to a temporary signal.

Projected Completion Date: 1/1/2024
SR26 (NINE FOOT RD) Vicinity: DAGSBORO

SR26 will close for crossroad pipe replacement on 11/7/2023 between FOX RUN RD and GUM TREE RD.
Proposed Completion Date: 12/8/2023

SR26 will close for crossroad pipe replacement on 11/28/2023 between FOX RUN RD and HICKORY HILL RD.
Proposed Completion Date: 12/8/2023

SR26 will close for crossroad pipe replacement on 12/14/2023 between RASBERRY RD and BLACKBERRY RD.
Proposed Completion Date: 12/22/2023
SR36 (CEDAR BEACH RD) Vicinity: MILFORD

SR36 will close over SR1 to resurface bridge deck. Work will begin on 11/2/2023 between SAPP RD and BEAVER DAM RD.

Projected Completion Date: 12/22/2025
SR72 (CHAPEL ST) Vicinity: NEWARK

SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR.

Projected Completion Date: 7/31/2024
SR896 SB RAMP TO I95 NB Vicinity: NEWARK

SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet.

Projected Completion Date: 5/1/2024
TYNDALL RD (CR444) Vicinity: GEORGETOWN

TYNDALL RD will close on 12/4/2023 for crossroad pipe replacement between SR20 and US9.

Projected Completion Date: 12/15/2023
US13A (N CENTRAL AVE) Vicinity: LAUREL

US13A will close for crossroad pipe replacement on 11/16/2023 between SR24 and FRONT ST.

Projected Completion Date: 1/5/2024