OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
ARROW SAFETY RD (CR87) | Vicinity: GEORGETOWN ARROW SAFETY RD is closed for reconstruction between US113 and S BEDFORD RD. Projected Completion Date: 11/1/2023 |
BLACKBIRD FOREST RD (CR471) | Vicinity: CLAYTON BLACKBIRD FOREST RD will close at the Railroad Crossing on 9/25/2023 between BLACKBIRD GREENSPRING RD and VANDYKE GREENSPRING RD. Projected Completion Date: 9/28/2023 |
BLACKBIRD LANDING RD (CR455) | Vicinity: TOWNSEND BLACKBIRD LANDING RD will close over BLACKBIRD CREEK beginning 8/21/2023. Projected Completion Date: 10/25/2023 |
I295 (DELAWARE MEMORIAL BRIDGE) | Vicinity: NEW CASTLE The two right lanes on I295 Northbound over the Delaware Memorial Bridge will close on 9/5/2023. Maximum load width of 20 feet will apply during this phase on construction. No night time movement option during this phase of construction. Projected Completion Date: 11/27/2023 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 |
MARSH BRANCH RD (CR441) | Vicinity: GREENWOOD MARSH BRANCH RD is closed for crossroad pipe replacement between US13 and WOODYARD RD. Projected Completion Date: 11/24/2023 |
MILLCREEK RD (CR282) | Vicinity: HOCKESSIN MILLCREEK RD will close on 10/2/2023 for tree removal between BRACKENVILLE RD and MENDENHALL MILL RD. Projected Completion Date: 10/5/2023 |
OLD COOCHS BRIDGE RD (CR408) | Vicinity: NEWARK OLD COOCHS BRIDGE RD intersection with SR896 is closed for reconstruction. Detour: Access to OLD COOCHS BRIDGE RD should be made from OLD BALTIMORE PIKE. Proposed Completion Date: 11/1/2023 |
OLD KENNETT PIKE (CR243) | Vicinity: WILMINGTON OLD KENNETT PIKE will close for crossroad pipe replacement on 5/15/2023 between ASHLAND SCHOOL RD and WAY RD. Projected Completion Date: 10/27/2023 |
OLD KENNETT RD (CR243) | Vicinity: WILMINGTON OLD KENNETT RD is restricted to a maximum load width of 15 feet between OWLS NEST RD and the DE/PA LINE. Projected Completion Date: 12/31/2023 |
RED MILL RD (CR352) | Vicinity: NEWARK RED MILL RD Southbound, is restricted to loads with a maximum width of 10 feet, between SR2 and DARWIN DR. Projected Completion Date: 10/1/2023 |
ROBINSONVILLE RD (CR277) | Vicinity: LEWES ROBINSONVILLE RD intersection with PLANTATION RD is closed for intersection improvements. Projected Completion Date: 10/16/2023 |
ROSS STATION RD (CR543) | Vicinity: SEAFORD ROSS STATION RD will close at the Railroad Crossing on 10/9/2023 located between PARK AVE and CONRAIL RD. Projected Completion Date: 10/12/2023 |
S BAY RD | Vicinity: DOVER S BAY RD under SR1 overpass, BRIDGE 2924S 150, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 8/24/2023. Projected Completion Date: 10/5/2023 |
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) | Vicinity: DOVER SR1 under OLD LEBANON RD overpass, BRIDGE 2357B 357, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 8/7/2023. Projected Completion Date: 10/25/2023 |
SR1 SB RAMP TO S REHOBOTH BLVD | Vicinity: MILFORD SR1 Southbound ramp to S REHOBOTH BLVD will close for bridge repair beginning 7/17/2023. Projected Completion Date: 10/16/2023 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 at MULBERRY KNOLL RD has a maximum height restriction of 15 feet, 5 inches due to a temporary signal. Projected Completion Date: 1/1/2024 |
SR6 (WOODLAND BEACH RD) | Vicinity: SMYRNA SR6 is restricted to loads with a maximum width of 10 feet over BRIDGE 2010A 009 located between HAY POINT LANDING RD and DELAWARE AVE. Projected Completion Date: 9/30/2023 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and SCOTTFIELD DR. Projected Completion Date: 7/31/2024 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Nortbound is restricted to a maximum width of 16 feet. Projected Completion Date: 12/1/2024 |
VANDYKE GREENSPRING RD (CR47) | Vicinity: CLAYTON VANDYKE GREENSPRING RD will close at the Railroad Crossing on 10/2/2023 between BLACKBIRD GREENSPRING RD and CLAYTON GREENSPRING RD. Projected Completion Date: 10/6/2023 |
WILSON HILL RD (CR527) | Vicinity: BRIDGEVILLE WILSON HILL RD is closed for crossroad pipe replacement between PIGLET PATH RD and HUNTING CLUB RD. Projected Completion Date: 9/25/2023 |