Skip to Content Skip to Navigation
Delaware.gov logo

Delaware Department of Transportation

Oversize / Overweight Permit System

Temporary Route Restrictions


OSOW Temporary Restrictions

Restricted Route Name Restricted Route Description
AIRPORT RD (CR 319) Vicinity: GEORGETOWN

AIRPORT RD will close on 6/12/2021 for intersection improvements between US 9 and STERLIING AVE.

Projected Completion Date: 8/27/2021
BRACKENVILLE RD (CR274) Vicinity: HOCKESSIN

BRACKENVILLE RD is closed between OLD WILMINGTON RD and BARLEY MILL RD.

Projected Completion Date: 6/21/2021
FRAZER RD (CR391) Vicinity: NEWARK

FRAZER RD between OLD COUNTY RD and DENNY RD will close on 6/28/2021 for crossroad pipe replacement.

Projected Completion Date: 7/9/2021
HARVEY STRAUGHN RD (CR7) Vicinity: CLAYTON

HARVEY STRAUGHN RD will close for bridge replacement over Black Stallion Ditch between MORRIS RD and OAK HILL SCHOOL RD beginning 7/6/2021.

Projected Completion Date: 8/14/2021
I 95 Northbound & Southbound I-95 Northbound and Southbound will be restricted to a maximum width of 10 feet beginning 2/12/2021 located between the I-95/I-495 split and US202. For details or a hyperlink to images of the I-95 project please click on the NEWS link on the left tool bar and see the News Link item dated 2/4/2021. Project will operate in contraflow configuration until approximately 12/31/2022. Please see News link item dated 2/4/2021 to a hyperlink of updated images of the construction project.
I95 SB RAMP TO SR141 NB (EXIT 5B) Vicinity: WILMINGTON

I95 Southbound ramp to SR141 Northbound will close for ramp improvements on 6/17/2021.

Projected Completion Date: 6/21/2021
KILLENS POND RD (CR 384) Vicinity: FELTON

KILLENS POND RD RD will close on 6/1/2021 for crossroad pipe replacement between SANDBOX RD and BLOOMFIELD DR.

Projected Completion Date: 7/2/2021
N REHOBOTH BLVD (SR1A) Vicinity: MILFORD

N REHOBOTH BLVD will close at the draw bridge over the Mispillion River on 6/14/2021.

Projected Completion Date: 6/25/2021
OWENS RD (CR611) Vicinity: GREENWOOD

OWENS RD is closed for crossroad pipe replacement between SR16 and HUNTERS COVE RD.

Projected Completion Date: 6/21/2021
SAWMILL RD (CR601) Vicinity: GREENWOOD

SAWMILL RD will close on 6/21/2021 for crossroad pipe replacement between TUCKERS RD and SR16.

Projected Completion Date: 7/23/2021
SHEEP PEN RD (CR328) Vicinity: MILLSBORO

SHEEP PEN RD is closed between SR20 and GODWIN SCHOOL RD for reconfiguration.

Detour: COUNTRY LIVING RD

Projected Completion Date: 7/1/2021
SILVER LAKE RD (CR 442) Vicinity : MIDDLETOWN

SILVER LAKE RD will close beginning 2/1/2021 for repairs to the dam located between NOXONTOWN RD and SANDBURG BLVD.

Projected Completion Date: 6/25/2021
SR 1 NB and SB Vicinity: SMYRNA

SR1 between NORTH SMYRNA (Exit 119) and SR 8 (Exit 98) will be restricted to a maximum height of 14' 6" for bridge painting beginning March 15, 2021.

Projected Completion Date: 6/15/2021
SR10 EB (E LEBANON RD) Vicinity: DOVER

SR 10, EASTBOUND, will close on 6/7/2021 for bridge deck repair over the St. Jones River.

Projected Completion Date: 6/27/2021
SR141 NB & SB (W BASIN RD) Vicinity: NEW CASTLE

SR141 Northbound and Southbound will be restricted to a maximum width of 10 feet between COMMONS BLVD and the US13 SOUTHBOUND RAMP beginning 8/2/2020.

Projected Completion Date: 7/1/2021
SR18 (CANNON RD) Vicinity: SEAFORD

CANNON RD will close on 6/7/21 for bridge repair between ELKS RD and US 13.

Detour : ELKS RD to or from US 13

Projected Completion Date: 7/2/2021
SR36 (CEDAR BEACH RD) Vicinity: SLAUGHTER BEACH

SR36 is closed at the drawbridge located between LIGHTHOUSE RD and DOCKSIDE DR.

Projected Completion Date: 7/15/2021
SR4 EB (CHRISTINA PARKWAY) Vicinity: NEWARK

SR4 EASTBOUND at the intersection with ELKTON RD will close beginning 7/8/2021 for concrete repair.

Projected Completion Date: 7/30/2021
SR4 WB (CHRISTINA PARKWAY) Vicinity: NEWARK

SR4 WESTBOUND at the intersection with ELKTON RD will close beginning 7/8/2021 for concrete repair.

Projected Completion Date: 7/30/2021


 ADA Information
+