Restricted Route Name Restricted Route Description
BETTS POND RD (CR326) Vicinity: MILLSBORO

The BETTS POND RD intersection with US113 will close for reconfiguration beginning 11/11/2024.

Detour: Suggest SR24.

Projected Completion Date: 9/1/2025
CAVE NECK RD (CR88) Vicinity: MILTON

CAVE NECK RD will close for bridge repair on 5/19/2025 located between HUDSON RD and DIAMOND FARM RD.

Projected Completion Date: 8/15/2025
HOLLYVILLE RD (CR305) Vicinity: MILLSBORO

HOLLYVILLE RD will close on 6/16/2025 for new alignment with SR20 construction project located between SR24 and WASHINGTON ST EXT.

Proposed Completion Date: 8/18/2025
I295 NB RAMP TO SR141 NB (EXIT 5B) Vicinity: NEW CASTLE

Exit 5B, I295 Northbound Ramp to SR141 Northbound will be restricted to a maximum width of 12 feet beginning 4/3/2025 due to the placement of pinned barrier.

Projected Completion Date: 7/15/2025
I295 NB RAMP TO US13 NB Vicinity: NEW CASTLE

I295 Northbound ramp to US13 Northbound will close for ramp improvements on 8/27/2024.

Projected Completion Date: 6/30/2025
I295 SB Vicinity: WILMINGTON

I295 Southbound under Bridge 1739 059 will be restricted to a maximum load height of 14 feet, 9 inches due to the placement of shielding beginning 3/31/2025.

This will affect loads moving to I95 Northbound, I95 Southbound and SR141 Northbound.

Projected Completion Date: 3/31/2026
I495 SB RAMP TO I295 NB Vicinity: WILMINGTON

I495 Southbound ramp to I295 Northbound is restricted to a maximum load width of 13 feet due to ramp improvements.

Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route.

Projected Completion Date: 6/30/2026
I495 SOUTHBOUND (BRIDGE 1 800 060) BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED.

FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTREME RIGHT HAND LANE.

FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND.

Proposed Completion Date: 12/31/2026
I95 NB Vicinity: NEWARK

I95 Northbound at the SR273 Interchange, Bridges 1715B 6047, 1715A 6048, and 1715 018, will be restricted to a maximum load height of 14 feet, 5 inches due to the placement of shielding beginning 5/27/2025.

Detour: 95 - 273 - 1 - 95

Projected Completion Date: 9/1/2025
I95 NB RAMP TO SR896 Vicinity: NEWARK
I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration.
Proposed Completion Date: 12/31/2025

Vicinity: NEWARK
I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration.
Proposed Completion Date: 12/31/2025
I95 SB RAMP TO I295 NB (EXIT 5C) Vicinity: WILMINGTON

I95 Southbound ramp to I295 Northbound (Exit 5C) is restricted to a maximum load width of 13 feet due to ramp improvements.

Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route. This restriction will be in place until March, 2026.

Projected Completion Date: 4/30/2026
I95 SB RAMP TO SR896 SB Vicinity: NEWARK

I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder.
Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet.

Projected Completion Date: 7/1/2025
I95 SB and I495 SB to US13 NB VICINITY: WILMINGTON

95 SB & 495 SB off ramp to US13 NB will be closed beginning 6/28/2025

Proposed Completion Date: 6/30/2025
KENTON RD (CR104) Vicinity: DOVER

KENTON RD will close for road improvements beginning 4/8/2025 located between SR8 and COLLEGE RD.

Projected Completion Date: 6/27/2025
LOREWOOD GROVE RD (CR412) Vicinity: MIDDLETOWN

LOREWOOD GROVE RD will close for crossroad pipe replacement on 6/16/2025 located between RATLEDGE RD and OLD SUMMIT BRIDGE RD.

Projected Completion Date: 7/18/2025
RAMSEY RD (CR224) Vicinity: WILMINGTON

RAMSEY RD will close for crossroad pipe replacement on 6/9/2025 located between SR92 and BRANDYWINE CREEK RD.

Projected Completion Date: 6/14/2025
SR1 (COASTAL HWY) Vicinity: MILTON
SR1, Northbound and Southbound, has moved into a contraflow pattern and is restricted to a maximum load width of 18 feet between SR5 and the Broadkill River near Milton.
Projected Completion Date: 6/30/2025
SR10 (W LEBANON RD) Vicinity: DOVER

SR10 Eastbound, will be restricted to loads with a maximum width of 14 feet beginning 4/14/2025, located between CATALDI LN and S STATE ST.

Projected Completion Date: 6/30/2025
SR141 SB RAMP TO I295 NB (EXIT 2) Vicinity: NEW CASTLE

Exit 2, SR141 Southbound Ramp to I295 Northbound will be restricted to a maximum width of 12 feet beginning 4/3/2025 due to the placement of pinned barrier.

Projected Completion Date: 7/15/2025

Exit ramp 2, SR 141 Southbound Ramp to I295 Northbound will be closed beginning 6/28/2025 and ending 6/30/2025
SR20 (HARDSCRABBLE RD) Vicinity: MILLSBORO

The SR20 intersection with US113 will close for reconfiguration beginning 11/11/2024.

Detour: Suggest SR24 as a southern detour and US9 as a northern detour.

Projected Completion Date: 9/1/2025
SR299 (MAIN ST) Vicinity: MIDDLETOWN

SR299 will close for paving on 6/30/2025 located between FRONT ST and OLD CORBITT RD.

Projected Completion Date: 7/21/2025
SR896 RAMP TO I95 SB Vicinity: NEWARK

SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration.

Detour, please use 896 - 4 - 273 - 95 - ect

Proposed Completion Date: 7/1/2025
SR896 SB RAMP TO I95 NB Vicinity: NEWARK

SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet.

Projected Completion Date: 7/1/2025
SR9 (RIVER RD) Vicinity: NEW CASTLE

SR9 will close for guardrail and paving work on 6/30/2025 located between CARROLL DR and CLYMER ST.

Projected Completion Date: 7/14/2025