OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
FORK BRANCH RD (CR153) | Vicinity: DOVER FORK BRANCH RD will close for crossroad pipe replacement on 11/27/2023 between US13 and MCKEE RD. Projected Completion Date: 12/8/2023 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 9/1/2024 |
OLD COOCHS BRIDGE RD (CR408) | Vicinity: NEWARK OLD COOCHS BRIDGE RD intersection with SR896 is closed for reconstruction. Detour: Access to OLD COOCHS BRIDGE RD should be made from OLD BALTIMORE PIKE. Proposed Completion Date: 4/30/2024 |
OLD KENNETT RD (CR243) | Vicinity: WILMINGTON OLD KENNETT RD will close for culvert replacement on 11/27/2023 between ASHLAND SCHOOL RD and WAY RD. Projected Completion Date: 12/11/2023 |
PLANTATION RD (CR275) | Vicinity: LEWES PLANTATION RD will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SHADY RD. Projected Completion Date: 5/15/2024 |
ROGERS RD (CR369) | Vicinity: WILMINGTON ROGERS RD is closed between MARKET ST and S HEALD ST for reconstruction. Projected Completion Date: 1/16/2024 |
S BAY RD | Vicinity: DOVER S BAY RD under SR1 overpass, BRIDGE 2924S 150, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 8/24/2023. Projected Completion Date: 12/22/2023 |
SR1 (BAY RD) | Vicinity: MILFORD SR1 under US113 overpass, BRIDGE 2008J 008, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 10/23/2023. Projected Completion Date: 12/8/2023 SR1 under SR36 will be restricted to loads with a maximum width of 20 feet due to shoulder closures. Projected Completion Date: 12/22/2023 |
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) | Vicinity: DOVER SR 1 under the PUNCHEON RUN CONNECTOR overpass, BRIDGE 2926 150A, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 10/19/2023. Projected Completion Date: 12/10/2023 |
SR23 (BEAVER DAM RD) | Vicinity: LEWES SR23 will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SALT MARSH BLVD. Projected Completion Date: 5/15/2024 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 at MULBERRY KNOLL RD has a maximum height restriction of 15 feet, 5 inches due to a temporary signal. Projected Completion Date: 1/1/2024 |
SR26 (NINE FOOT RD) | Vicinity: DAGSBORO SR26 will close for crossroad pipe replacement on 11/7/2023 between FOX RUN RD and GUM TREE RD. Proposed Completion Date: 12/8/2023 SR26 will close for crossroad pipe replacement on 11/28/2023 between FOX RUN RD and HICKORY HILL RD. Proposed Completion Date: 12/8/2023 |
SR36 (CEDAR BEACH RD) | Vicinity: MILFORD SR36 will close over SR1 to resurface bridge deck. Work will begin on 11/2/2023 between SAPP RD and BEAVER DAM RD. Projected Completion Date: 12/22/2025 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR. Projected Completion Date: 7/31/2024 |
SR72 NORTHBOUND (SUNSET LAKE RD) | Vicinity: NEWARK SR72 Northbound will be closed for paving between US40 and OLD BALTIMORE PIKE on 12/2/2023 and 12/3/2023. |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Nortbound is restricted to a maximum width of 16 feet. Projected Completion Date: 12/1/2024 |
SR9 (BAYSIDE DR) | Vicinity: DOVER SR9 will close for crossroad pipe replacement on 11/27/2023 between SAVANNAH RD and SILVER LEAF LN. Projected Completion Date: 12/1/2023 |
US13 (S HEALD ST) | Vicinity: WILMINGTON S HEALD ST will close over ROGERS RD on 11/18/2023 for crossroad pipe replacement. Proposed Completion Date: 2/20/2023 |
US13A (N CENTRAL AVE) | Vicinity: LAUREL US13A will close for crossroad pipe replacement on 11/16/2023 between SR24 and FRONT ST. Projected Completion Date: 1/5/2024 |