Oversize / Overweight Permit System

Temporary Route Restrictions


OSOW Temporary Restrictions

Restricted Route Name Restricted Route Description
ARROW SAFETY RD (CR87) Vicinity: GEORGETOWN

ARROW SAFETY RD is closed for reconstruction between US113 and S BEDFORD RD.

Projected Completion Date: 3/6/2023
BRIARWOOD RD (CR253) Vicinity: GEORGETOWN

BRIARWOOD RD will close on 2/6/2023 for crossroad pipe replacement between SHINGLE POINT RD and SAND HILL RD.

Projected Completion Date: 2/24/2023
CAMP ARROWHEAD RD (CR279) Vicinity: REHOBOTH BEACH

CAMP ARROWHEAD RD will close on 9/19/2022 for roadway improvements between SR24 and JOLYNS WAY.

Projected Completion Date: 2/1/2023
I295 NB (DELAWARE MEMORIAL BRIDGE) Vicinity: NEW CASTLE

I295 Northbound over the Delaware Memorial Bridge will be restricted to a maximum width of 20 feet with no nighttime movement option over the bridge beginning 2/1/2023.
Loads must use the two far right lanes.

Projected Completion Date: 5/25/2023
MOUNT JOY RD (CR297) Vicinity: MILLSBORO

MOUNT JOY RD will close at SR24 for intersection improvements beginning 2/6/2023.

Projected Completion Date: 2/15/2023
MUD MILL RD (CR207) Vicinity: SANDTOWN

MUD MILL RD is closed for bridge repair between HERON CIR and the DE/MD LINE.

Projected Completion Date: 3/14/2023
N STATE ST (CR25) Vicinity: DOVER

N STATE ST will close for crossroad pipe replacement beginning 10/31/2022 between PENNSYLVANIA AVE and CECIL ST.

Projected Completion Date: 2/27/2023
OLD KENNETT RD (CR243) Vicinity: WILMINGTON

OLD KENNETT RD is restricted to a maximum load width of 15 feet between OWLS NEST RD and the DE/PA LINE.

Projected Completion Date: 12/31/2023
OTTS CHAPEL RD (CR397) Vicinity: NEWARK

OTTS CHAPEL RD will close on 11/29/2022 for bridge repair between W CHESTNUT HILL RD and WELSH TRACT RD.

Projected Completion Date: 2/28/2023
PROSPECT CHURCH RD (CR114) Vicinity: HARRINGTON

PROSPECT CHURCH RD will close for crossroad pipe replacement beginning 11/7/2022 between SR14 and HAMMONDTOWN RD.

Projected Completion Date: 2/3/2023
SOPHERS ROW (CR377) Vicinity: MAGNOLIA

SOPHERS ROW will close on 1/3/2023 for crossroad pipe replacement between CLAPHAM RD and IRISH HILL RD.

Projected Completion Date: 3/3/2023
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) Vicinity: NEW CASTLE
SR1 under LOWER TWIN LANE RD overpass, BRIDGE 1318 406, will be restricted to a maximum height of 14 feet 6 inches for the placement of a work platform due to painting.
This height restriction will be in place for both Northbound and Southbound lanes and begin on 1/12/2023.
Projected Completion Date: 2/14/2023
SR15 (S SALISBURY RD) Vicinity: DOVER

A temporary signal pole has been installed at the Intersection of SR15 and SR8. As a result, the signal height from the roadway has a finished height of 15 feet, 8 inches until such time as a permanent repair can be made.

Projected Completion Date: 4/15/2023
SR1A (REHOBOTH BLVD) Vicinity: MILFORD

REHOBOTH BLVD is closed for repairs to the drawbridge located over the Mispillion River.

Porjected Completion Date: 4/7/2023
SR24 (JOHN J WILLIAMS HWY) Vicinity: MILLSBORO
SR24 is restricted to a maximum load width of 10 feet between BAY FARM RD and OAK ORCHARD RD.
Projected Completion Date: 3/30/2023

Vicinity: LEWES
SR24 is restricted to a maximum load width of 11 feet between HOLLYMOUNT RD and DORMAN RD at Burtons Pond.
Projected Completion Date: 3/15/2023
SR9 (5TH ST) Vicinity: DELAWARE CITY

SR9 will close for the construction of a roundabout beginning 1/6/2023 at the POLKTOWN PLACE intersection.

SR9 (REEDY POINT BRIDGE) over the C&D Canal will be closed during the duration of the construction project.

Projected Completion Date: 3/20/2023
SUGAR HILL RD (CR599) Vicinity: GREENWOOD

SUGAR HILL RD will close for crossroad pipe replacement beginning 1/16/2023 between FAWN RD and ST JOHNSTOWN RD.

Projected Completion Date: 1/27/2023
US13 (DUPONT PARKWAY) Vicinity: SMYRNA
US13 under the SR1 overpass, BRIDGE 1914 080, will be restricted to a maximum height of 14 feet 6 inches for the placement of a work platform due to painting.
This height restriction will be in place for both Northbound and Southbound lanes and begin on 10/17/2022.
Projected Completion Date: 2/17/2023
WOLF RD (CR603) Vicinity: GREENWOOD

WOLF RD will close on 1/30/2023 for crossroad pipe replacement between SR16 and OAK RD.

Projected Completion Date: 2/24/2023