OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
ANGOLA RD (CR277) | Vicinity: LEWES ANGOLA RD will close for safety improvements on 9/3/2024 located between SR24 and COTTAGE CT. Projected Completion Date: 12/2/2024 |
CABIN RIDGE RD (CR253) | Vicinity: FELTON CABIN RIDGE RD will close on 9/16/2024 for crossroad pipe replacement between HORSEPEN RD and SR10. Projected Completion Date: 9/27/2024 |
CICADA LN (CR403) | Vicinity: MILFORD CICADA LN is closed for crossroad pipe replacement between SR1 and CONNELLY RD. Proposed Completion Date: 11/22/2024 |
DICKERSON RD (CR337A) | Vicinity: MILLSBORO DICKERSON RD will close for reconstruction on 9/4/2024 located between US113 and HANDY RD. Projected Completion Date: 9/27/2024 |
HOLLYVILLE RD (CR305) | Vicinity: MILLSBORO HOLLYVILLE RD will close for crossroad pipe replacement on 8/19/2024 located between WASHINGTON ST EXT and SR24. Projected Completion Date: 11/22/2024 |
I295 NB RAMP TO US13 NB | Vicinity: NEW CASTLE I295 Nouthbound ramp to US13 Nouthbound will close for ramp improvements on 8/27/2024. Projected Completion Date: 5/21/2025 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. Proposed Completion Date: 1/1/2025 |
I95 NB RAMP TO AIRPORT RD AND SR141 (EXIT 5A) | Vicinity: NEW CASTLE I95 Northbound exit to AIRPORT RD and SR141 will close on 8/27/2024 for ramp improvements. Projected Completion Date: 10/26/2024 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 7/1/2025 |
MILLCREEK RD (CR282) | Vicinity: HOCKESSIN MILLCREEK RD will close for hazardous tree removal on 9/18/2024 located between STONEY BATTER RD and MENDENHALL MILL RD. Projected Completion Date: 9/20/2024 |
MT PLEASANT RD (CR493) | Vicinity: LAUREL MT PLEASANT RD will close for crossroad pipe replacement on 8/12/2024 located between SR24 and AIRPORT RD. Projected Completion Date: 11/1/2024 |
OLD BALTIMORE PIKE (CR26) | Vicinity: NEWARK OLD BALTIMORE PIKE will close to install a new culvert box on 9/18/2024 located between SR273 and SR7. Projected Completion Date: 11/27/2024 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
PEPPER RD (CR483A) | Vicinity: SEAFORD PEPPER RD will close for crossroad pipe replacement on 10/7/2024 located between BAKER MILL RD and SR20. Projected Completion Date: 10/14/2024 |
SPRING HILL DR (CR424) | Vicinity: MILFORD SPRING HILL DR is closed for crossroad pipe replacement between SR1 and REYNOLDS RD. Proposed Completion Date: 11/22/2024 |
SR1 (BAY RD) | Vicinity: FREDERCA SR1, Northbound and Southbound, has moved into a contraflow pattern and is restricted to a maximum load wdth of 18 feet between SR12 overpass North of Frederica and the Thompsonville overpass near Milford. Projected Completion Date: 11/15/2024 |
SR141 SB RAMP TO I295 NB (EXIT 2) | Vicinity: NEW CASTLE Exit 2, SR141 Southbound Ramp to I295 Northbound will close on 8/26/2024 for ramp improvements. Projected Completion Date: 2/23/2025 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024. As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY. Projected Completion Date: 12/4/2024 |
SR6 (E COMMERCE ST) | Vicinity: SMYRNA SR6 will close for sewer main repairs on 7/1/2024 located between US13 and LOCUST ST. Projected Completion Date: 9/13/2024 |
SR896 RAMP TO I95 SB | Vicinity: NEWARK SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration. Detour, please use 896 - 4 - 273 - 95 - ect Proposed Completion Date: 7/1/2025 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 7/1/2025 |
TAYLOR MILL RD (CR467B) | Vicinity: LAUREL TAYLOR MILL RD will close on 9/23/2024 for crossroad pipe replacement located between W ELLIOTTS DAM RD and FIRE TOWER RD. Projected Completion Date: 9/30/2024 TAYLOR MILL RD will close on 9/30/2024 for crossroad pipe replacement located between W ELLIOTTS DAM RD and SYCAMORE RD. Projected Completion Date: 10/7/2024 |
UNION CHURCH RD (CR456) | Vicinity: TOWNSEND UNION CHURCH RD will close for crossroad pipe replacement on 9/9/2024 located between BLACKBIRD LANDING RD and SR9. Projected Completion Date: 9/13/2024 |