OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
CALDWELL CORNER RD (CR25) | Vicinity: TOWNSEND CALDWELL CORNER RD will close on 2/26/2024 between VANDYKE GREENSPRING RD and DOGTOWN RD for the reconstruction of a bridge culvert. Projected Completion Date: 5/15/2024 |
CENTERVILLE RD (CR333) | Vicinity: NEWPORT CENTERVILLE RD Northbound and Southbound is restricted to a maximum height of 14 feet, 3 inches for bridge painting, under SR2 and SR141 (Bridge 1600 006). Projected Completion Date: 5/15/2024 |
DENNY RD (CR396) | Vicinity: GLASGOW DENNY RD will close on 4/15/2024 for a roundabout between SR896 and LEXINGTON PARKWAY. Projected Completion Date: 5/22/2024 |
HOURGLASS RD (CR103) | Vicinity: HARTLY HOURBLASS RD will close for crossroad pipe replacement on 5/13/2024 between SR8 and BRYANTS CORNER RD. Projected Completion Date: 5/16/2024 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. Proposed Completion Date: 7/15/2024 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 5/1/2025 |
KING ST (CR71) | Vicinity: LAUREL KING ST will close on 3/18/2024 for bridge replacement between SR24 and E 6TH ST. Projected Completion Date: 6/3/2024 |
KINGS RD (CR322) | Vicinity: GEORGETOWN KINGS RD will close for crossroad pipe replacement on 5/6/2024 located between SHORTLY RD and KRUGER RD. Projected Completion Date: 5/10/2024 |
LOWES CROSSING RD (CR61) | Vicinity: MILLSBORO LOWES CROSSING RD will close for crossroad pipe replacement on 5/7/2024 between PEAR TREE RD and SR26. Projected Completion Date: 5/14/2024 |
MILLCREEK RD (CR282) | Vicinity: WILMINGTON MILLCREEK RD will close for crossroad pipe replacement between MCKENNANS CHURCH RD and SR41 beginning 5/13/2024. Projected Completion Date: 5/21/2024 |
NEW WHARF RD (CR409) | Vicinity: MILFORD NEW WHARF RD will close for bridge maintenance on 4/15/2024 between NE 10TH ST and BIG STONE BEACH RD. Projected Completion Date: 5/21/2024 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
PLANTATION RD (CR275) | Vicinity: LEWES PLANTATION RD will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SHADY RD. Projected Completion Date: 5/15/2024 |
REEVES CROSSING RD (CR286) | Vicinity: FELTON REEVES CROSSING RD will close at the Railroad Crossing for resurfacing on 6/1/2024 located between US13 and LITTLE MASTENS CORNER RD. Projected Completion Date: 6/4/2024 |
ROBINSONVILLE RD (CR277) | Vicinity: REHOBOTH BEACH ROBINSONVILLE RD will close for road safety improvements on 5/12/2024 located between SR24 and CONLEYS CHAPEL RD. Projected Completion Date: 8/14/2024 |
SR20 (HARDSCRAPPLE RD) | Vicinity: MILLSBORO SR20 will close for crossroad pipe replacement on 5/13/2024 located between US113 and COUNTRY LIVING RD. Projected Completion Date: 5/20/2024 |
SR23 (BEAVER DAM RD) | Vicinity: LEWES SR23 will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SALT MARSH BLVD. Projected Completion Date: 5/15/2024 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024. As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY. Projected Completion Date: 12/4/2024 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 at MULBERRY KNOLL RD has a maximum height restriction of 15 feet, 5 inches due to a temporary signal. Projected Completion Date: 6/1/2024 |
SR6 (E COMMERCE ST) | Vicinity: SMYRNA E COMMENCE ST will close for water main repair on 5/7/2024 between US13 and S MAIN ST. Projected Completion Date: 5/11/2024 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR. Projected Completion Date: 7/31/2024 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 5/1/2025 |
SR9 (DELAWARE CITY PORT PENN RD) | Vicinity: DELAWARE CITY The REEDY POINT BRIDGE on SR9 over the C&D Canal, will be restricted to one lane with a maximum width restriction of 12 feet. Proposed Completion Date: 8/28/2024 |
TRAP POND RD (CR449) | Vicinity: LAUREL TRAP POND RD will close for spillway repairs over HITCH POND BRANCH on 5/20/2024 located between SR24 and HITCH POND RD. Projected Completion Date: 8/30/2024 |
US13BR (S MARKET ST) | Vicinity: WILMINGTON S MARKET ST will close for reconstruction on 4/8/2024 between NEW SWEDEN ST and I495 RAMP. Projected Completion Date: 5/24/2024 |
WALLER RD (CR480) | Vicinity: LAUREL WALLER RD will close for crossroad pipe replacement on 5/13/2024 located between DILLARDS RD and FIRETOWER RD. Projected Completion Date: 5/17/2024 |