OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
404BR (SEASHORE HWY) | Vicinity: BRIDGEVILLE 404BR will close for bridge work over Bridgeville Branch on 10/14/2024 located between RAY RD and FEDERALSBURG RD. Proposed Completion Date: 12/19/2024 |
ANGOLA RD (CR277) | Vicinity: LEWES ANGOLA RD will close for safety improvements on 9/3/2024 located between SR24 and COTTAGE CT. Projected Completion Date: 12/2/2024 |
BUCKS BRANCH RD (CR560) | Vicinity: SEAFORD BUCKS BRANCH RD will close for crossroad pipe replacement between FEDERALSBURG RD and ATLANTA RD on 10/21/2024. Projected Completion Date: 11/15/2024 |
CICADA LN (CR403) | Vicinity: MILFORD CICADA LN is closed for crossroad pipe replacement between SR1 and CONNELLY RD. Proposed Completion Date: 11/22/2024 |
HOLLYVILLE RD (CR305) | Vicinity: MILLSBORO HOLLYVILLE RD will close for crossroad pipe replacement on 8/19/2024 located between WASHINGTON ST EXT and SR24. Projected Completion Date: 11/22/2024 |
I295 NB RAMP TO US13 NB | Vicinity: NEW CASTLE I295 Nouthbound ramp to US13 Nouthbound will close for ramp improvements on 8/27/2024. Projected Completion Date: 5/21/2025 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. Proposed Completion Date: 1/1/2025 |
I95 NB RAMP TO AIRPORT RD AND SR141 (EXIT 5A) | Vicinity: NEW CASTLE I95 Northbound exit to AIRPORT RD and SR141 will close on 8/27/2024 for ramp improvements. Projected Completion Date: 10/26/2024 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 7/1/2025 |
MILLERS NECK RD (CR364A) | Vicinity: FRANKFORD MILLERS NECK RD will close for realignment on 10/9/2024 located between OLD MILL BRIDGE RD and DIRICKSON CREEK RD. Projected Completion Date: 2/4/2025 |
MT PLEASANT RD (CR493) | Vicinity: LAUREL MT PLEASANT RD will close for crossroad pipe replacement on 8/12/2024 located between SR24 and AIRPORT RD. Projected Completion Date: 11/1/2024 |
NEW RD (CR266) | Vicinity: LEWES NEW RD will be restricted to loads with a maximum width of 11 feet for a lane closure to begin on 10/7/2024 located between CREEKSIDE DR and PARK RD. Projected Completion Date: 11/30/2024 |
OLD BALTIMORE PIKE (CR26) | Vicinity: NEWARK OLD BALTIMORE PIKE will close to install a new culvert box on 9/18/2024 located between SR273 and FIELDSTREAM DR. Projected Completion Date: 12/10/2024 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
PEPPER RD (CR483A) | Vicinity: SEAFORD PEPPER RD will close for crossroad pipe replacement on 10/10/2024 located between BAKER MILL RD and SR20. Projected Completion Date: 10/18/2024 |
PLEASANT HILL RD (CR301) | Vicinity: NEWARK PLEASANT HILL RD will close on 10/9/2024 and 10/10/2024 for hazardous tree removal located between CORNER KETCH RD and THOMPSON STATION RD. |
REEVES CROSSING RD (CR286) | Vicinity: FELTON REEVES CROSSING RD will close at the Railroad Crossing on 10/12/2024 located between US13 and LTTLE MASTENS CORNER RD. Projected Completion Date: 10/18/2024 |
SPRING HILL DR (CR424) | Vicinity: MILFORD SPRING HILL DR is closed for crossroad pipe replacement between SR1 and REYNOLDS RD. Proposed Completion Date: 11/22/2024 |
SR1 (BAY RD) | Vicinity: FREDERCA SR1, Northbound and Southbound, has moved into a contraflow pattern and is restricted to a maximum load wdth of 18 feet between SR12 overpass North of Frederica and the Thompsonville overpass near Milford. Projected Completion Date: 11/15/2024 |
SR141 SB RAMP TO I295 NB (EXIT 2) | Vicinity: NEW CASTLE Exit 2, SR141 Southbound Ramp to I295 Northbound will close on 8/26/2024 for ramp improvements. Projected Completion Date: 2/23/2025 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024. As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY. Projected Completion Date: 12/4/2024 |
SR896 RAMP TO I95 SB | Vicinity: NEWARK SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration. Detour, please use 896 - 4 - 273 - 95 - ect Proposed Completion Date: 7/1/2025 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 7/1/2025 |
SR9 (E 4TH ST) | Vicinity: WILMINGTON E 4TH ST will close over the Christina River for bridge maintenance beginning on 10/28/2024. Projected Completion Date: 11/8/2024 |
SUBSTATION RD (CR366) | Vicinity: MILLVILLE SUBSTATION RD will close for roadway improvements on 10/22/2024 located between BEAVER DAM RD and BURBAGE RD. Projected Completion Date: 12/6/2024 |
TAYLOR MILL RD (CR467B) | Vicinity: LAUREL TAYLOR MILL RD will close on 10/3/2024 for crossroad pipe replacement located between W ELLIOTTS DAM RD and SYCAMORE RD. Projected Completion Date: 10/11/2024 |