Skip to Content Skip to Navigation
Delaware.gov logo

Delaware Department of Transportation

Virtual Workshop - Design-Build Statewide Pipe Replacement for BR3-914A on Beach Highway / SR 16

[an error occurred while processing this directive]

Design-Build Statewide Pipe Replacement for BR 3-914A on Beach Highway / SR 16

Comment submission has ended. Thank you.

Welcome to the Delaware Department of Transportation's virtual workshop. The goals of the virtual workshop format are to make it easier for the public to view the project information and to reduce the costs involved in traditional public workshops. This is a workshop regarding the replacement of Design-Build Statewide Pipe Replacement for BR 3-914A on SR16 / Beach Highway.

Bridge Photos Bridge 3-914A has been identified by DelDOT’s bridge management system as being in need of repair. The existing structure consists of a 60-inch diameter corrugated round steel pipe with a length of 74 feet. The replacement of Bridge 3-914A has been proposed as part of a statewide culvert replacement contract to replace corroding corrugated metal pipes.

Construction Plan The scope of the proposed project is to replace the existing pipe with a 60-inch diameter circular reinforced concrete pipe that is 80 feet in length with riprap aprons installed at the culvert openings both upstream and downstream.

Bridge Plan, Section and Elevation: In keeping with the Department’s mission that includes providing “a safe, efficient, and environmentally sensitive transportation network”, the proposed design will limit any impact to the surrounding areas. The proposed structure consists of a 60-inch reinforced concrete pipe 80 feet in length. The upstream and downstream embankments and the channel bed at the pipe openings will be protected with R-4 riprap aprons. Two 12-foot, bituminous travel lanes at a 2% slope with 8-foot paved shoulders at a slope of 4% are proposed.

[Maintenance of Traffic] Because of the nature of the work and DelDOT’s commitment to safety of the public, a portion of the roadway will be closed for the duration of the project. Temporary closure of SR16 / Beach Highway between Blacksmith Shop Road(S44) and Webb Farm Road(S594) shall be necessary during the duration of this contract. A detour route has been provided and can be found under [Detour Information] on this project's website.

Right-of-Way Plan Although we strive to perform as much of our work within our existing right-of-way as possible, sometimes the nature of the work requires a larger area than what is provided, as is the case for this project. Existing right-of-way is 30 feet on either side of the roadway centerline with additional easements upstream and downstream of the existing bridge. Temporary easements shall be utilized at all 4 corners of the project to allow access for all proposed work to the bridge. All areas disturbed within these limits shall be restored to their natural condition upon completion of the work.

A real estate representative will contact any impacted property owners to review the Department's Real Estate process.


If you would like to make comments, you may submit comments by clicking on the link, "Virtual Workshop Survey/Comments". Or you may call toll free to 800-652-5600, or call locally in the Dover area, 760-2080. Comments may also be mailed to:

DelDOT Community Relations
P.O. Box 778
Dover, Delaware 19903

Comments are due within 45 days of the posting of this virtual workshop on the internet. Thank you for participating in the Delaware Department of Transportation's virtual workshop.



 ADA Information
+