OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
AIRPORT RD (CR340) | Vicinity: NEW CASTLE AIRPORT RD is closed for bridge work beginning 5/22/2023 between I95 NORTHBOUND OFF RAMP and MCARTHUR RD. Projected Completion Date: 6/23/2023 |
ARROW SAFETY RD (CR87) | Vicinity: GEORGETOWN ARROW SAFETY RD is closed for reconstruction between US113 and S BEDFORD RD. Projected Completion Date: 8/1/2023 |
ATLANTA RD (CR30) | Vicinity: SEAFORD ATLANTA RD will close for crossroad pipe replacement on 5/30/2023 located between BOYCE RD and OWLS NEST RD. Projected Completion Date: 6/16/2023 Vicinity: SEAFORD ATLANTA RD will close for crossroad pipe replacement on 6/12/2023 located between OWLS NEST RD and ROSS STATION RD. Projected Completion Date: 6/23/2023 |
I95 NB RAMP TO SR896 SB | Vicinity: NEWARK !95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2023 |
LOCKWOOD CHAPEL RD (CR171) | Vicinity: HARTLY LOCKWOOD CHAPEL RD will close for crossroad pipe replacement on 6/20/2023 between PEARSONS CORNER RD and JUDITH RD. Projected Completion Date: 6/23/2023 |
MT PLEASANT RD (CR493) | Vicinity: LAUREL MT PLEASANT RD will close over PORTSVILLE MILLPOND for bridge work beginning 5/17/2023. Projected Completion Date: 7/2/2023 |
MUD MILL RD (CR207) | Vicinity: SANDTOWN MUD MILL RD is closed for bridge repair between HERON CIR and the DE/MD LINE. Projected Completion Date: 7/28/2023 |
N STATE ST (CR25) | Vicinity: DOVER N STATE ST will close for crossroad pipe replacement beginning 10/31/2022 between SR8 and CECIL ST. Projected Completion Date: 6/30/2023 |
OLD COOCHS BRIDGE RD (CR408) | Vicinity: NEWARK OLD COOCHS BRIDGE RD intersection with SR896 is closed for reconstruction. Detour: Access to OLD COOCHS BRIDGE RD should be made from OLD BALTIMORE PIKE. Proposed Completion Date: 9/1/2023 |
OLD KENNETT PIKE (CR243) | Vicinity: WILMINGTON OLD KENNETT PIKE will close for crossroad pipe replacement on 5/15/2023 between ASHLAND SCHOOL RD and WAY RD. Projected Completion Date: 8/29/2023 |
OLD KENNETT RD (CR243) | Vicinity: WILMINGTON OLD KENNETT RD is restricted to a maximum load width of 15 feet between OWLS NEST RD and the DE/PA LINE. Projected Completion Date: 12/31/2023 |
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) | Vicinity: BEAR SR1 under SR72 overpass, BRIDGE 1301 356, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 4/3/2023. Projected Completion Date: 6/16/2023 Vicinity: MIDDLETOWN SR1 under SR299 overpass, BRIDGE 1438A 438, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. Projected Completion Date: 6/16/2023 Vicinity: MIDDLETOWN SR1 under BAYVIEW RD overpass, BRIDGE 1423A 423, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 5/2/2023. Projected Completion Date: 6/23/2023 Vicinity: DOVER SR1 under WHITE OAK RD overpass, BRIDGE 2066B 066, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 6/19/2023. Projected Completion Date: 7/21/2023 |
SR15 (S SALISBURY RD) | Vicinity: DOVER A temporary signal pole has been installed at the Intersection of SR15 and SR8. As a result, the signal height from the roadway has a finished height of 15 feet, 3 inches until such time as a permanent repair can be made. Projected Completion Date: 7/1/2023 |
SR1A (REHOBOTH BLVD) | Vicinity: MILFORD REHOBOTH BLVD is closed for repairs to the drawbridge located over the Mispillion River. Porjected Completion Date: 7/10/2023 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: MILLSBORO SR24 is restricted to a maximum load width of 10 feet between BAY FARM RD and OAK ORCHARD RD. Projected Completion Date: 6/30/2023 |
SR6 (WOODLAND BEACH RD) | Vicinity: SMYRNA SR6 is restricted to loads with a maximum width of 10 feet over BRIDGE 2010A 009 located between HAY POINT LANDING RD and DELAWARE AVE. Projected Completion Date: 8/25/2023 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and SCOTTFIELD DR. Projected Completion Date: 7/31/2024 |
W ROBBINS RD (CR579) | Vicinity: GEORGETOWN W ROBBINS RD will close for crossroad pipe replacement between REDDEN RD and MAPLE BRANCH RD beginning 3/20/2023. Projected Completion Date: 6/16/2023 |