ARROW SAFETY RD (CR87) | Vicinity: GEORGETOWN ARROW SAFETY RD is closed for reconstruction between US113 and S BEDFORD RD. Projected Completion Date: 8/1/2023 |
BARLEY MILL RD (CR259) | Vicinity: GREENVILLE BARLEY MILL RD will close at the RAILROAD CROSSING on 5/22/2023 located between CENTERVILLE RD and BRACKENVILLE RD. Projected Completion Date: 5/26/2023 |
COLUMBIA RD (CR76) | Vicinity: DELMAR COLUMBIA RD will close for crossroad pipe replacement between MAY TWILLEY RD and SR54 beginning 3/20/2023. Projected Completion Date: 4/14/2023 |
DEXTER CORNER RD (CR36) | Vicinity: TOWNSEND DEXTER CORNER RD will close at the Railroad Crossing on 3/27/2023 between MAIN ST and RATLEDGE RD. Proposed Completion Date: 3/30/2023 |
EAST ST (CR350) | Vicinity: HARRINGTON EAST ST will close at the Railroad Crossing on 4/3/2023 between FAIRGROUND RD and SR14. Projected Completion Date: 4/7/2023. |
GOVERNOR STOCKLEY RD (CR632) | Vicinity: GEORGETOWN GOVERNOR STOCKLEY RD will close for crossroad pipe replacement between BETHESDA RD and ZOAR RD beginning 3/28/2023. Projected Completion Date: 4/7/2023 |
I295 NB (DELAWARE MEMORIAL BRIDGE) | Vicinity: NEW CASTLE I295 Northbound over the Delaware Memorial Bridge will be restricted to a maximum width of 20 feet with no nighttime movement option over the bridge beginning 2/1/2023. Loads must use the two far right lanes. Projected Completion Date: 5/25/2023 |
JEFFERSON BRIDGE RD (CR361A) | Vicinity: BETHANY BEACH JEFFERSON BRIDGE RD will close on 3/14/2023 for roadway improvements between SR1 and PENNSYLVANIA AVE. Proposed Completion Date: 4/7/2023 |
MILLERS NECK RD (CR364A) | Vicinity: FRANKFORD MILLERS NECK RD will close for crossroad pipe replacement beginning 2/13/2023 between CAMP BARNES RD and OLD MILL BRIDGE RD. Projected Completion Date: 4/14/2023 |
MUD MILL RD (CR207) | Vicinity: SANDTOWN MUD MILL RD is closed for bridge repair between HERON CIR and the DE/MD LINE. Projected Completion Date: 7/28/2023 |
N STATE ST (CR25) | Vicinity: DOVER N STATE ST will close for crossroad pipe replacement beginning 10/31/2022 between SR8 and CECIL ST. Projected Completion Date: 6/30/2023 |
OLD COOCHS BRIDGE RD (CR408) | Vicinity: NEWARK OLD COOCHS BRIDGE RD is closed for crossroad pipe replacement between PHOENIX AVE and OLD BALTIMORE PIKE. Proposed Completion Date: 4/17/2023 |
OLD KENNETT RD (CR243) | Vicinity: WILMINGTON OLD KENNETT RD is restricted to a maximum load width of 15 feet between OWLS NEST RD and the DE/PA LINE. Projected Completion Date: 12/31/2023 |
PROSPECT CHURCH RD (CR114) | Vicinity: HARRINGTON PROSPECT CHURCH RD will close for crossroad pipe replacement beginning 11/7/2022 between SR14 and HAMMONDTOWN RD. Projected Completion Date: 4/14/2023 |
REMENTER RD (CR517A) | Vicinity: GEORGETOWN REMENTER RD will close on 3/28/2023 for crossroad pipe replacement between OLD FURNACE RD and RUM BRIDGE RD. Projected Completion Date: 4/10/2023 |
SR1 (KOREAN WAR VETERANS MEMORIAL HWY) | Vicinity: NEW CASTLE SR1 under LOWER TWIN LANE RD overpass, BRIDGE 1318 406, will be restricted to a maximum height of 14 feet 6 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 1/12/2023. Projected Completion Date: 4/7/2023 Vicinity: BEAR SR1 under SR72 overpass, BRIDGE 1301 356, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 4/3/2023. Projected Completion Date: 5/15/2023 Vicinity: MIDDLETOWN SR1 under SR299 overpass, BRIDGE 1438A 438, will be restricted to a maximum height of 14 feet 3 inches for the placement of a work platform due to painting. This height restriction will be in place for both Northbound and Southbound lanes and begin on 2/28/2023. Projected Completion Date: 4/28/2023 |
SR15 (S SALISBURY RD) | Vicinity: DOVER A temporary signal pole has been installed at the Intersection of SR15 and SR8. As a result, the signal height from the roadway has a finished height of 15 feet, 8 inches until such time as a permanent repair can be made. Projected Completion Date: 4/15/2023 |
SR1A (REHOBOTH BLVD) | Vicinity: MILFORD REHOBOTH BLVD is closed for repairs to the drawbridge located over the Mispillion River. Porjected Completion Date: 4/7/2023 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: MILLSBORO SR24 is restricted to a maximum load width of 10 feet between BAY FARM RD and OAK ORCHARD RD. Projected Completion Date: 3/30/2023 Vicinity: LEWES SR24 is restricted to a maximum load width of 11 feet between HOLLYMOUNT RD and DORMAN RD at Burtons Pond. Projected Completion Date: 4/1/2023 |
SR6 (WOODLAND BEACH RD) | Vicinity: SMYRNA SR6 is restricted to loads with a maximum width of 10 feet over BRIDGE 2010A 009 located between HAY POINT LANDING RD and DELAWARE AVE. Projected Completion Date: 8/25/2023 |
SR7 SOUTHBOUND UNDER I95 | Vicinity: CHRISTIANA SR7 Southbound under I95 will be closed the following weekends: March 18th and 19th, March 25th and 26th and, April 1st and 2nd. Detour: 7 - 95 - 273 - 1 |
TUXWARD RD (CR220) | Vicinity: MARYDEL TUXWARD RD will close for crossroad pipe replacement on 2/8/2023 between SR8 and BRYANTS CORNER RD. Proposed Completion Date: 5/5/2023 |
VALLEY RD (CR362) | Vicinity: NEWARK VALLEY RD will close for crossroad pipe replacement on 3/13/2023 between BRIARCREEK CT and the DE/MD LINE. Projected Completion Date: 4/23/2023 |
W ROBBINS RD (CR579) | Vicinity: GEORGETOWN W ROBBINS RD will close for crossroad pipe replacement between REDDEN RD and MAPLE BRANCH RD beginning 3/20/2023. Projected Completion Date: 5/20/2023 |
WOODLAND CHURCH RD (CR79) | Vicinity: SEAFORD WOODLAND CHURCH RD is closed for crossroad pipe replacement between WOODLAND FERRY RD and BOWMAN RD. Projected Completion Date: 4/1/2023 |