Skip to Content Skip to Navigation
Delaware.gov logo

Delaware Department of Transportation

Oversize / Overweight Permit System

Temporary Route Restrictions


OSOW Temporary Restrictions

Restricted Route Name Restricted Route Description
404BR (SEASHORE HWY) Vicinity: BRIDGEVILLE

404BR will close for bridge work over Bridgeville Branch on 10/21/2024 located between RAY RD and FEDERALSBURG RD.

Proposed Completion Date: 12/26/2024
ANGOLA RD (CR277) Vicinity: LEWES

ANGOLA RD will close for safety improvements on 9/3/2024 located between SR24 and COTTAGE CT.

Projected Completion Date: 12/2/2024
BETTS POND RD (CR326) Vicinity: MILLSBORO

The BETTS POND RD intersection with US113 will close for reconfiguration beginning 11/11/2024.

Detour: Suggest SR24.

Projected Completion Date: 9/1/2025
BUCKS BRANCH RD (CR560) Vicinity: SEAFORD

BUCKS BRANCH RD will close for crossroad pipe replacement between FEDERALSBURG RD and ATLANTA RD on 10/21/2024.

Projected Completion Date: 11/15/2024
CHURCHTOWN RD (CR432) Vicinity: MIDDLETOWN

CHURCHTOWN will close for crossroad pipe replacement on 11/6/2024 located between CHOPTANK RD and SUMMIT BRIDGE RD.

Projected Completion Date: 11/22/2024
CICADA LN (CR403) Vicinity: MILFORD

CICADA LN is closed for crossroad pipe replacement between SR1 and CONNELLY RD.

Proposed Completion Date: 11/22/2024
HOLLYVILLE RD (CR305) Vicinity: MILLSBORO

HOLLYVILLE RD will close for crossroad pipe replacement on 8/19/2024 located between WASHINGTON ST EXT and SR24.

Projected Completion Date: 11/22/2024
I295 NB RAMP TO US13 NB Vicinity: NEW CASTLE

I295 Nouthbound ramp to US13 Nouthbound will close for ramp improvements on 8/27/2024.

Projected Completion Date: 5/21/2025
I495 SOUTHBOUND (BRIDGE 1 800 060) BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED.

FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE.

FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND.

Proposed Completion Date: 1/1/2025
I95 NB RAMP TO AIRPORT RD AND SR141 (EXIT 5A) Vicinity: NEW CASTLE

I95 Northbound exit to AIRPORT RD and SR141 will close on 8/27/2024 for ramp improvements.

Projected Completion Date: 11/8/2024
I95 NB RAMP TO SR896 Vicinity: NEWARK
I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration.
Proposed Completion Date: 5/1/2025

Vicinity: NEWARK
I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration.
Proposed Completion Date: 5/1/2025
I95 SB RAMP TO SR896 SB Vicinity: NEWARK

I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder.
Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet.

Projected Completion Date: 7/1/2025
MILLERS NECK RD (CR364A) Vicinity: FRANKFORD

MILLERS NECK RD will close for realignment on 10/9/2024 located between OLD MILL BRIDGE RD and DIRICKSON CREEK RD.

Projected Completion Date: 2/4/2025
NEW RD (CR266) Vicinity: LEWES

NEW RD will be restricted to loads with a maximum width of 11 feet for a lane closure to begin on 10/7/2024 located between CREEKSIDE DR and PARK RD.

Projected Completion Date: 11/30/2024
OLD BALTIMORE PIKE (CR26) Vicinity: NEWARK

OLD BALTIMORE PIKE will close to install a new culvert box on 9/18/2024 located between SR273 and FIELDSTREAM DR.

Projected Completion Date: 12/10/2024
PATRIOTS WAY (CR318) Vicinity: MILLSBORO

PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024.

Projected Completion Date: 12/31/2029
SPRING HILL DR (CR424) Vicinity: MILFORD

SPRING HILL DR is closed for crossroad pipe replacement between SR1 and REYNOLDS RD.

Proposed Completion Date: 11/22/2024
SR1 (BAY RD) Vicinity: FREDERCA

SR1, Northbound and Southbound, has moved into a contraflow pattern and is restricted to a maximum load wdth of 18 feet between SR12 overpass North of Frederica and the Thompsonville overpass near Milford.

Projected Completion Date: 11/15/2024
SR141 SB RAMP TO I295 NB (EXIT 2) Vicinity: NEW CASTLE

Exit 2, SR141 Southbound Ramp to I295 Northbound will close on 8/26/2024 for ramp improvements.

Projected Completion Date: 2/23/2025
SR20 (HARDSCRAPPLE RD) Vicinity: MILLSBORO

The SR20 intersection with US113 will close for reconfiguration beginning 11/11/2024.

Detour: Suggest SR24 as a southern detour and US9 as a northern detour.

Projected Completion Date: 9/1/2025
SR24 (JOHN J WILLIAMS HWY) Vicinity: LEWES

SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024.
As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY.

Projected Completion Date: 12/4/2024
SR896 RAMP TO I95 SB Vicinity: NEWARK

SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration.

Detour, please use 896 - 4 - 273 - 95 - ect

Proposed Completion Date: 7/1/2025
SR896 SB RAMP TO I95 NB Vicinity: NEWARK

SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet.

Projected Completion Date: 7/1/2025
SR9 (E 4TH ST) Vicinity: WILMINGTON

E 4TH ST will close over the Christina River for bridge maintenance beginning on 11/6/2024.

Projected Completion Date: 11/22/2024
SUBSTATION RD (CR366) Vicinity: MILLVILLE

SUBSTATON RD will close for drainage and resurfacing on 11/12/2024 located between BURBAGE RD and BEAVER DAM RD.

Projected Completion Date: 12/6/2024


 ADA Information
+