OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
BETTS POND RD (CR326) | Vicinity: MILLSBORO The BETTS POND RD intersection with US113 will close for reconfiguration beginning 11/11/2024. Detour: Suggest SR24. Projected Completion Date: 9/1/2025 |
CICADA LN (CR403) | Vicinity: MILFORD CICADA LN is closed for crossroad pipe replacement between SR1 and CONNELLY RD. Proposed Completion Date: 4/16/2025 |
GREENBANK RD (CR330) | Vicinity: ELSMERE GREENBANK RD will close at the Railroad Crossing on 3/24/2025 located between NEWPORT GAP PIKE and ALBERTSON RD. Proposed Completion Date: 3/31/2025 |
I295 NB RAMP TO US13 NB | Vicinity: NEW CASTLE I295 Nouthbound ramp to US13 Nouthbound will close for ramp improvements on 8/27/2024. Projected Completion Date: 5/21/2025 |
I295 SB | Vicinity: WILMINGTON I295 Southbound under Bridge 1739 059 will be restricted to a maximum load height of 14 feet, 6 inches due to the placement of shielding beginning 3/31/2025. This will affect loads moving to I95 Northbound and I95 Southbound. Projected Completion Date: 3/31/2026 |
I495 SB RAMP TO I295 NB | Vicinity: WILMINGTON Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route. Projected Completion Date: 6/30/2026 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. Proposed Completion Date: 5/31/2025 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 |
I95 SB RAMP TO I295 NB (EXIT 5C) | Vicinity: WILMINGTON I95 Southbound ramp to I295 Northbound (Exit 5C) is restricted to a maximum load width of 13 feet due to ramp improvements. Temporary shielding has been placed under Bridge 1738 059 resulting in a height reduction of 14 feet, 6 inches along this route. This restriction will be in place until March, 2026. Projected Completion Date: 4/30/2025 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 7/1/2025 |
KENTON RD (CR104) | Vicinity: DOVER KENTON RD will close for road improvements beginning 4/7/2025 located between SR8 and COLLEGE RD. Projected Completion Date: 5/23/2025 |
MUNCHY BRANCH RD (CR270B) | Vicinity: LEWES MUNCHY BRANCH RD will close for road improvements on 3/10/2025 located between WOLFE NECK RD and FIELD LN. Projected Completion Date: 5/9/2025 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
ROUND POLE BRIDGE RD (CR257) | Vicinity: MILTON ROUND POLE BRIDGE RD will close for road improvements on 3/24/2025 loacted between HUDSON RD and CAVE NECK RD. Projected Completion Date: 4/30/2025 |
SPRING HILL DR (CR424) | Vicinity: MILFORD SPRING HILL DR is closed for crossroad pipe replacement between SR1 and REYNOLDS RD. Proposed Completion Date: 4/16/2025 |
SR1 (BAY RD) | Vicinity: FREDERICA SR1, Northbound and Southbound, has moved into a contraflow pattern and is restricted to a maximum load width of 18 feet between SR12 overpass North of Frederica and the Thompsonville overpass near Milford. Projected Completion Date: 4/16/2025 |
SR141 SB RAMP TO I295 NB (EXIT 2) | Vicinity: NEW CASTLE Exit 2, SR141 Southbound Ramp to I295 Northbound will close on 8/26/2024 for ramp improvements. Projected Completion Date: 4/15/2025 |
SR16 (BROADKILL RD) | Vicinity: BROADKILL BEACH SR16 is restricted to a maximum load width of 10 feet for bridge repair West of Broadkill Beach, over BRIDGE 3812 016. Projected Completion Date: 5/16/2025 |
SR20 (ARMORY RD) | Vicinity: FRANKFORD SR20 will close for bridge repair at Bridge 3-440 over VINES CREEK, on 2/24/2025, located between OMAR RD and PEACHTREE LN. Projected Completion Date: 5/16/2025 |
SR20 (HARDSCRAPPLE RD) | Vicinity: MILLSBORO The SR20 intersection with US113 will close for reconfiguration beginning 11/11/2024. Detour: Suggest SR24 as a southern detour and US9 as a northern detour. Projected Completion Date: 9/1/2025 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024. As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY. Projected Completion Date: 5/1/2025 |
SR34 (FAULKLAND RD) | Vicinity: WILMINGTON FAULKLAND RD is closed for emergency construction located between SR41 and CENTERVILLE RD. Projected Completion Date: 3/31/2025 |
SR36 (CEDAR BEACH RD) | Vicinity: SLAUGHTER BEACH SR36 is closed at the drawbridge over Cedar Creek, BRIDGE 3164 036, for bridge repair. Projected Completion Date: 3/22/2025 |
SR896 RAMP TO I95 SB | Vicinity: NEWARK SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration. Detour, please use 896 - 4 - 273 - 95 - ect Proposed Completion Date: 7/1/2025 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 7/1/2025 |