OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
CALDWELL CORNER RD (CR25) | Vicinity: TOWNSEND CALDWELL CORNER RD will close on 2/26/2024 between VANDYKE GREENSPRING RD and DOGTOWN RD for the reconstruction of a bridge culvert. Projected Completion Date: 5/1/2024 |
CENTERVILLE RD (CR333) | Vicinity: NEWPORT CENTERVILLE RD Northbound and Southbound is restricted to a maximum height of 14 feet, 3 inches for bridge painting, under SR2 and SR141 (Bridge 1600 006). Projected Completion Date: 5/15/2024 |
CREEK RD (CR230) | Vicinity: YORKLYN CREEK RD will close for tree removal on 5/6/2024 located between WAY RD and MT CUBA RD. Projected Completion Date: 5/10/2024 |
DENNY RD (CR396) | Vicinity: GLASGOW DENNY RD will close on 4/15/2024 for a roundabout between SR896 and LEXINGTON PARKWAY. Projected Completion Date: 5/22/2024 |
FORDS CORNER RD (CR98) | Vicinity: HARTLY FORDS CORNER RD will close on 4/29/2024 for crossroad pipe replacement between SR44 and BURRIS RD. Projected Completion Date: 5/3/2024 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 6/15/2024 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 5/1/2024 |
KING ST (CR71) | Vicinity: LAUREL KING ST will close on 3/18/2024 for bridge replacement between SR24 and E 6TH ST. Projected Completion Date: 6/3/2024 |
KRUGER RD (CR321) | Vicinity: GEORGETOWN KRUGER RD will close for crossroad pipe replacement on 5/1/2024 between BUNTING RD and BREASURE RD. Projected Completion Date: 5/9/2024 |
LOWES CROSSING RD (CR61) | Vicinity: MILLSBORO LOWES CROSSING RD will close for crossroad pipe replacement on 4/23/2024 between CAREYS CAMP RD and KINGS CROSSING RD. Projected Completion Date: 5/1/2024 LOWES CROSSING RD will close for crossroad pipe replacement on 5/1/2024 between JONES CHURCH RD and PEAR TREE RD. Projected Completion Date: 5/7/2024 LOWES CROSSING RD will close for crossroad pipe replacement on 5/1/2024 between PEAR TREE RD and SR26. Projected Completion Date: 5/6/2024 |
MILLCREEK RD (CR282) | Vicinity: WILMINGTON MILLCREEK RD will close for crossroad pipe replacement between STONEY BATTER RD and GRAVES RD beginning 4/27/2024. Projected Completion Date: 5/13/2024 |
N OAK GROVE RD (CR549) | Vicinity: SEAFORD N OAK GROVE RD will close on 5/6/2024 for crossroad pipe replacement between SR20 and OAK GROVE RD. Projected Completion Date: 5/20/2024 |
NEW WHARF RD (CR409) | Vicinity: MILFORD NEW WHARF RD will close for bridge maintenance on 4/15/2024 between NE 10TH ST and BIG STONE BEACH RD. Projected Completion Date: 5/21/2024 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
PEPPERBOX RD (CR66) | Vicinity: DELMAR PEPPERBOX RD is closed for crossroad pipe replacement between SR54 and BAKER RD. Projected Completion Date: 5/31/2024 |
PLANTATION RD (CR275) | Vicinity: LEWES PLANTATION RD will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SHADY RD. Projected Completion Date: 5/15/2024 |
REEVES CROSSING RD (CR286) | Vicinity: FELTON REEVES CROSSING RD will close at the Railroad Crossing for resurfacing on 6/1/2024 located between US13 and LITTLE MASTENS CORNER RD. Projected Completion Date: 6/4/2024 |
ROBINSONVILLE RD (CR277) | Vicinity: REHOBOTH BEACH ROBINSONVILLE RD will close for road safety improvements on 5/6/2024 located between SR24 and CONLEYS CHAPEL RD. Projected Completion Date: 8/14/2024 |
S WALNUT ST (CR20) | Vicinity: MILFORD S WALNUT ST will close over the MISPILLION RIVER on 3/18/2024 located between SR14 and SE FRONT ST. Projected Completion Date: 5/1/2024 |
SR1 NB AND SB UNDER SR36 | Vicinity: MILFORD SR1 both Northbound and Southbound will be restricted to a maximum load width of 20 feet beginning on 4/9/2024 under the SR36 overpass due to the placement of pinned barrier. Projected Completion Date: 5/15/2024 |
SR1 SB RAMP TO SR36 | Vicinity: MILFORD SR1 Southbound ramp to SR36 will close on 2/15/2024 as part of the SR1 construction project. Projected Completion Date: 5/7/2024 |
SR17 (ROXANA RD) | Vicinity: FRANKFORD SR17 will close for crossroad pipe replacement on 4/23/2024 located between SMITHFIELD ACRES RD and POLLY BRANCH RD. Projected Completion Date: 5/7/2024 |
SR23 (BEAVER DAM RD) | Vicinity: LEWES SR23 will close for construction of a roundabout on 11/5/2023 between BELLTOWN RD and SALT MARSH BLVD. Projected Completion Date: 5/15/2024 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 at MULBERRY KNOLL RD has a maximum height restriction of 15 feet, 5 inches due to a temporary signal. Projected Completion Date: 6/1/2024 |
SR36 RAMP TO SR1 NB | Vicinity: MILFORD SR36 ramp to SR1 Northbound will close on 2/15/2024 as part of the SR1 construction project. Projected Completion Date: 5/7/2024 |
SR54 (LIGHTHOUSE RD) | Vicinity: FENWICK ISLAND SR54 Eastbound and Westbound is restricted to a maximum width of 11 feet between ISLAND RD and SR1 due to a pinned barrier. Projected Completion Date: 5/3/2024 |
SR6 (E COMMERCE ST) | Vicinity: SMYRNA SR6 will close for sewer upgrades on 4/29/2024 between US13 and MONROVIA AVE. Projected Completion Date: 5/9/2024 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR. Projected Completion Date: 7/31/2024 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 5/1/2024 |
US13A (BI STATE BLVD) | Vicinity: LAUREL BI STATE BLVD will close for crossroad pipe replacement on 4/12/2024 located between DUKES RD and HORSEY RD. Projected Completion Date: 4/30/2024 |
US13BR (S MARKET ST) | Vicinity: WILMINGTON S MARKET ST will close for reconstruction on 4/8/2024 between NEW SWEDEN ST and I495 RAMP. Projected Completion Date: 5/24/2024 |