OSOW Temporary Restrictions
Restricted Route Name | Restricted Route Description |
---|---|
FAIRGROUND RD (CR316) | Vicinity: HARRINGTON FAIRGROUND RD will close on 7/15/2024 for pedestrian safety during the State Fair between EAST ST and US13. Projected Completion Date: 7/29/2024 |
FIRETOWER RD (CR239) | Vicinity: FELTON FIRETOWER RD will close on 7/24/2024 for crossroad pipe replacement between TOMAHAWK LN and W EVANS RD. Projected Completion Date: 8/2/2024 |
FOX RUN RD | Vicinity: MILLSBORO FOX RUN RD will close on 8/5/2024 for realignment located between PATRIOTS WAY and BETTS POND RD. Projected Completion Date: 8/26/2024 |
I295 NB RAMP TO SR141 NB (EXIT 5B) | Vicinity: NEW CASTLE Exit 5B, I 295 Northbound Ramp to SR141 Northbound will close on 8/9/2024 for ramp improvements. Projected Completion Date: 8/11/2024 |
I295 SB RAMP TO US13 SB | Vicinity: NEW CASTLE I295 Southbound ramp to US13 Southbound will close for ramp improvements on 8/5/2024. Projected Completion Date: 8/9/2024 |
I495 SOUTHBOUND (BRIDGE 1 800 060) | BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED. FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE. FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND. Proposed Completion Date: 1/1/2025 |
I95 NB RAMP TO SR896 | Vicinity: NEWARK I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 Vicinity: NEWARK I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration. Proposed Completion Date: 5/1/2025 |
I95 SB RAMP TO SR896 SB | Vicinity: NEWARK I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder. Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet. Projected Completion Date: 7/1/2025 |
MT ZION RD (RD 480) | Vicinity: LAURELMT ZION RD (RD 480) will be closed between SEAFORD RD and US 13 (SUSSEX HWY) starting 7/12/2024 for crossroad pipe replacementEXPECTED COMPLETION: 8/9/2024 |
PATRIOTS WAY (CR318) | Vicinity: MILLSBORO PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024. Projected Completion Date: 12/31/2029 |
PUNCHEON RUN CONNECTOR NB RAMP TO S BAY RD (EXIT 2B) | Vicinity: DOVER PUNCHEON RUN CONNECTOR Northbound ramp to S BAY RD Northbound, Exit 2B, is closed for ramp improvements. Projected Completion Date: 8/5/2024 |
Pigeon Point Road | VICINITY: NEW CASTLE PIGEON POINT ROAD IS CLOSED AT THE INTERSECTION WITH PYLES LANE FOR CROSSROAD PIPE REPLACEMENT STARTING: 7/16/2024 EXPECTED PROJECT COMPLETION: 8/2/2024 DETOUR: LAMBSONS LANE TO NEW CASTLE AVENUE |
ROBINSONVILLE RD (CR277) | Vicinity: REHOBOTH BEACH ROBINSONVILLE RD will close for road safety improvements on 5/12/2024 located between SR24 and CONLEYS CHAPEL RD. Projected Completion Date: 8/14/2024 |
SANDY BEND RD (CR222) | Vicinity: MARYDEL SANDY BEND RD will close for crossroad pipe replacement on 7/31/2024 located between PARKERS CHAPEL RD and TAPPAHANABRIDGE RD. Projected Completion Date: 8/1/2024 |
SHALLCROSS LAKE RD (CR428) | Vicinity: MIDDLETOWN SHALLCROSS LAKE RD will close for drainage repair on 6/25/2024 between NANTUCKET DR and RUTH DR. Projected Completion Date: 7/26/2024 |
SR100 (MONTCHACHIN RD) | Vicinity: WILMINGTON MONTCHACHIN RD will close on 7/29/2024 for crossroad pipe replacement between SMITHBRIDGE RD and BRENDLE LN. Projected Completion Date: 8/9/2024 |
SR141 SB RAMP TO I295 NB (EXIT 2) | Vicinity: NEW CASTLE Exit 2, SR141 Southbound Ramp to I295 Northbound will close on 8/9/2024 for ramp improvements. Projected Completion Date: 8/11/2024 |
SR15 (DUCK CREEK RD) | Vicinity: CLAYTON DUCK CREEK RD will close for sewer main repairs on 7/15/2024 located between SR6 and HIGHLAND AVE. Projected Completion Date: 7/30/2024 |
SR24 (JOHN J WILLIAMS HWY) | Vicinity: LEWES SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024. As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY. Projected Completion Date: 12/4/2024 |
SR6 (E COMMERCE ST) | Vicinity: SMYRNA SR6 will close for sewer main repairs on 7/1/2024 located between US13 and LOCUST ST. Projected Completion Date: 8/23/2024 |
SR6 (MAIN ST) | Vicinity: CLAYTON SR6 will close for crossroad pipe replacement on 7/8/2024 located between DUCK CREEK RD and CLAYTON AVE. Projected Completion Date: 8/22/2024 |
SR72 (CHAPEL ST) | Vicinity: NEWARK SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR. Projected Completion Date: 7/31/2024 |
SR896 RAMP TO I95 SB | Vicinity: NEWARK SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration. Detour, please use 896 - 4 - 273 - 95 - ect Proposed Completion Date: 7/1/2025 |
SR896 SB RAMP TO I95 NB | Vicinity: NEWARK SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet. Projected Completion Date: 7/1/2025 |
SR9 (DELAWARE CITY PORT PENN RD) | Vicinity: DELAWARE CITY The REEDY POINT BRIDGE on SR9 over the C&D Canal, will be restricted to one lane with a maximum width restriction of 12 feet. Proposed Completion Date: 8/28/2024 |
TRAP POND RD (CR449) | Vicinity: LAUREL TRAP POND RD will close for spillway repairs over HITCH POND BRANCH on 5/20/2024 located between SR24 and HITCH POND RD. Projected Completion Date: 8/30/2024 |
US13 (S DUPONT HWY) | Vicinity: HARRINGTON US13 Northbound and Southbound will be restricted to a maximum load height of 18 feet on 7/15/2024 between FAIRGROUND RD and TOWER HILL RD. Projected Completion Date: 7/29/2024 |
WESTVILLE RD (CR208) | Vicinity: MARYDEL WESTVILLE RD will close on 8/5/2024 for crossroad pipe replacement located between TOWER RD and PINE TREE RD. Projected Completion Date: 8/8/2024 |