BLACKBIRD FOREST RD Vicinity CLAYTON

BLACKBIRD FOREST ROAD will be closed between HOLLETS CORNER RD and CLAYTON DELANEY RD starting 7/22/2024 for pipe replacement

EXPECTED COMPLETION: 7/24/2024
FAIRGROUND RD (CR316) Vicinity: HARRINGTON

FAIRGROUND RD will close on 7/15/2024 for pedestrian safety during the State Fair between EAST ST and US13.

Projected Completion Date: 7/29/2024
FIRETOWER RD (CR239) Vicinity: FELTON

FIRETOWER RD will close on 7/24/2024 for crossroad pipe replacement between TOMAHAWK LN and W EVANS RD.

Projected Completion Date: 8/2/2024
I495 SOUTHBOUND (BRIDGE 1 800 060) BRIDGE 1-800-060, I495 SOUTHBOUND DIRECTLY TO I95 SOUTHBOUND OR I295 NORTHBOUND IS CLOSED.

FOR TRAVEL TO I95 SOUTHBOUND, LOAD WILL USE EXIT 5 A-B (SR141 TOWARDS NEWPORT, NEW CASTLE) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO I95 SOUTHBOUND USING THE EXTEME RIGHT HAND LANE.

FOR TRAVEL TO I295 NORTHBOUND, LOAD WILL USE EXIT 1 (US13 TOWARDS WILMINGTON, DOVER) FROM I495 SOUTHBOUND. LOAD WILL THEN MERGE ONTO THE I295 NORTHBOUND RAMP FROM US13 SOUTHBOUND.

Proposed Completion Date: 7/15/2024
I95 NB RAMP TO SR896 Vicinity: NEWARK
I95 Northbound ramp to SR896 Southbound is closed for ramp reconfiguration.
Proposed Completion Date: 5/1/2025

Vicinity: NEWARK
I95 Northbound ramp to SR896 Northbound is closed for ramp reconfiguration.
Proposed Completion Date: 5/1/2025
I95 SB RAMP TO SR896 SB Vicinity: NEWARK

I95 Southbound ramp to SR896 Southbound will have barrier in place restricting lane width to 16 feet, plus shoulder.
Based on radius of the ramp, a load with a length of 100 feet should be restricted to a maximum width of 10 feet.

Projected Completion Date: 7/1/2025
JUMP SCHOOL HOUSE RD (CR258) Vicinity: FELTON

JUMP SCHOOL HOUSE RD is closed for crossroad pipe replacement between EQUITATION LN and SANDTOWN RD.

Projected Completion Date: 7/25/2024
MT ZION RD (RD 480) Vicinity: LAUREL

MT ZION RD (RD 480) will be closed between SEAFORD RD and US 13 (SUSSEX HWY) starting 7/12/2024 for crossroad pipe replacement

EXPECTED COMPLETION: 8/9/2024
OLD WILMINGTON RD (CR275) Vicinity: HOCKESSIN

OLD WILMINGTON RD will close for tree removal on 7/15/2024 located between LOVEVILLE RD and BRACKENVILLE RD.

Projected Completion Date: 7/18/2024
PATRIOTS WAY (CR318) Vicinity: MILLSBORO

PATRIOTS WAY will close to construct grade separated intersection between FOX RUN RD and US113 on 3/11/2024.

Projected Completion Date: 12/31/2029
PUNCHEON RUN CONNECTOR NB RAMP TO S BAY RD (EXIT 2B) Vicinity: DOVER

PUNCHEON RUN CONNECTOR Northbound ramp to S BAY RD Northbound, Exit 2B, is closed for ramp improvements.

Projected Completion Date: 8/5/2024
Pigeon Point Road VICINITY: NEW CASTLE

PIGEON POINT ROAD IS CLOSED AT THE INTERSECTION WITH PYLES LANE FOR CROSSROAD PIPE REPLACEMENT

STARTING: 7/16/2024

EXPECTED PROJECT COMPLETION: 8/2/2024

DETOUR: LAMBSONS LANE TO NEW CASTLE AVENUE
ROBINSONVILLE RD (CR277) Vicinity: REHOBOTH BEACH

ROBINSONVILLE RD will close for road safety improvements on 5/12/2024 located between SR24 and CONLEYS CHAPEL RD.

Projected Completion Date: 8/14/2024
SHALLCROSS LAKE RD (CR428) Vicinity: MIDDLETOWN

SHALLCROSS LAKE RD will close for drainage repair on 6/25/2024 between NANTUCKET DR and RUTH DR.

Projected Completion Date: 7/26/2024
SR 71 RED LION RD VICINITY: RED LION

SR 71 (RED LION ROAD) will be CLOSED between SR 72 (WRANGLE HILL RD) and JESTER STREET starting 7/22/2024 for paving and median construction

EXPECTED COMPLETION 7/26/2024
SR100 (MONTCHACHIN RD) Vicinity: WILMINGTON

MONTCHACHIN RD will close on 7/29/2024 for crossroad pipe replacement between SMITHBRIDGE RD and BRENDLE LN.

Projected Completion Date: 8/9/2024
SR15 (DUCK CREEK RD) Vicinity: CLAYTON

DUCK CREEK RD will close for sewer main repairs on 7/15/2024 located between SR6 and HIGHLAND AVE.

Projected Completion Date: 7/26/2024
SR24 (JOHN J WILLIAMS HWY) Vicinity: LEWES

SR24 will be moved into a contraflow pattern at the ROBINSONVILLE RD intersection for intersection improvements on 5/12/2024.
As a result, a maximum load width of 10 feet will be implemented between DORMAN RD and JOLYNS WAY.

Projected Completion Date: 12/4/2024
SR6 (E COMMERCE ST) Vicinity: SMYRNA

SR6 will close for sewer main repairs on 7/1/2024 located between US13 and LOCUST ST.

Projected Completion Date: 8/23/2024
SR6 (MAIN ST) Vicinity: CLAYTON

SR6 will close for crossroad pipe replacement on 7/8/2024 located between DUCK CREEK RD and CLAYTON AVE.

Projected Completion Date: 7/22/2024
SR72 (CHAPEL ST) Vicinity: NEWARK

SR72 will move into a contraflow configuration on 6/5/2023 reducing loads to a maximum width of 10 feet between BROOKHILL DR and DAWSON DR.

Projected Completion Date: 7/31/2024
SR896 RAMP TO I95 SB Vicinity: NEWARK

SR896 RAMP TO I95 Southbound is closed for ramp reconfiguration.

Detour, please use 896 - 4 - 273 - 95 - ect

Proposed Completion Date: 7/1/2025
SR896 SB RAMP TO I95 NB Vicinity: NEWARK

SR896 Southbound ramp to I95 Northbound is restricted to a maximum width of 16 feet.

Projected Completion Date: 7/1/2025
SR9 (DELAWARE CITY PORT PENN RD) Vicinity: DELAWARE CITY

The REEDY POINT BRIDGE on SR9 over the C&D Canal, will be restricted to one lane with a maximum width restriction of 12 feet.

Proposed Completion Date: 8/28/2024
TRAP POND RD (CR449) Vicinity: LAUREL

TRAP POND RD will close for spillway repairs over HITCH POND BRANCH on 5/20/2024 located between SR24 and HITCH POND RD.

Projected Completion Date: 8/30/2024
US13 (S DUPONT HWY) Vicinity: HARRINGTON

US13 Northbound and Southbound will be restricted to a maximum load height of 18 feet on 7/15/2024 between FAIRGROUND RD and TOWER HILL RD.

Projected Completion Date: 7/29/2024